219 DUFFERIN ST
Rev 01 - Revision to include Interior fit-out for base building, Office buildingProposal to demolish existing interior layout of southe Suite on both existing floors and constrct a new interior aly…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 01 - Revision to include Interior fit-out for base building, Office buildingProposal to demolish existing interior layout of southe Suite on both existing floors and constrct a new interior aly…
Rev 01 - Revision to include Interior fit-out for base building, Office buildingPlumbing - Proposal to demolish existing interior layout of southe Suite on both existing floors and constrct a new i…
Rev 01 - Revision to include Interior fit-out for base building, Office building.HVAC - Proposal to demolish existing interior layout of southe Suite on both existing floors and constrct a new inte…
Proposal for exterior alterations to replace existing windows & door with new windows, door & sidelights at the 2nd floor level existing office tenant's lounge area. Scope includes installing new s…
HVAC - -DEMOLITION OF EXISTING PARTITIONS & MILLWORK -REMOVAL AND REINSTALLATION OF EXISTING CEILING FIXTURES-INSTALLATION OF NEW PARTITIONS, CEILINGS AND WALL FINISHES
Proposal for interior alterations to a portion of the existing suite 100C located on the ground floor / 1st floor level. Scope includes:-DEMOLITION OF EXISTING PARTITIONS & MILLWORK -REMOVAL AND RE…
Plumbing - Proposal for Leasehold Improvements - Including HVAC & Plumbing
HVAC - Proposal for Leasehold Improvements - Including HVAC & Plumbing
Proposal for interior alterations to an existing office suite 310A, located on the 3rd floor level for office tenant - 'Isaac Group'. Leasehold Improvements including HVAC & Plumbing.
HVAC - Combine four suites (304A, 306A, 308A, 310A) into one, modify the suite entrances, new meeting room partitions, doors, screens and millwork throughout, including timber bleachers and pantry
Plumbing - Combine four suites (304A, 306A, 308A, 310A) into one, modify the suite entrances, new meeting room partitions, doors, screens and millwork throughout, including timber bleachers and pantry
Proposal for interior alterations to combine 4 existing suites (304A, 306A, 308A, 310A) into 1 new office suite on the 3rd floor level of the 'A Wing' for tenant - ''William Thomas Digital HQ'. Sco…
Drain - Proposal to demolish existing interior layout of southe Suite on both existing floors and constrct a new interior alyout for base building including opening two previously blocked in window…
HVAC - Proposal to demolish existing interior layout of southe Suite on both existing floors and constrct a new interior alyout for base building including opening two previously blocked in window …
Plumbing - Proposal to demolish existing interior layout of southe Suite on both existing floors and constrct a new interior alyout for base building including opening two previously blocked in win…
Proposal to demolish existing interior layout of southe Suite on both existing floors and constrct a new interior alyout for base building including opening two previously blocked in window opening…
Proposal to replace the fire alarm control panel and annunciator panel in an existing office building.
Revision # 01 - To the HVAC system on the 3rd floor of the existing office building.HVAC - Proposed interior alterations on the 3rd floor, back to base for future tenant fit-out in existing office …
Revise to the inter Proposed interior alterations on the 3rd floor, back to base for future tenant fit-out in existing office space.
Interior Alterations to office suite 120.9m2
Page numbers are hidden until the total count is available from the data service.