2201 EGLINTON AVE E
Rev 01: New concrete stair added for additional egress method.NEW OUTDOOR PATIO/TERRACE CONNECTED TO GROUP D OFFICE BUILDING. FOR INTERNAL USE ONLY. REFER TO ATTACHED ZONING CERTIFICATE. NEW TERRAC…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 01: New concrete stair added for additional egress method.NEW OUTDOOR PATIO/TERRACE CONNECTED TO GROUP D OFFICE BUILDING. FOR INTERNAL USE ONLY. REFER TO ATTACHED ZONING CERTIFICATE. NEW TERRAC…
FS - Sprinkler Shop Drawing - Proposal for interior alterations, including demolition and construction of new partition(s).
HVAC - Proposal for interior alterations, including demolition and construction of new partition(s).
Proposal for interior alterations, including demolition and construction of new partition(s).
Plumbing - NEW OUTDOOR PATIO/TERRACE CONNECTED TO GROUP D OFFICE BUILDING. FOR INTERNAL USE ONLY. REFER TO ATTACHED ZONING CERTIFICATE. NEW TERRACE INCLUDES: NEW RAMP, RETAINING WALL, GUARDS, HANDR…
HVAC - NEW OUTDOOR PATIO/TERRACE CONNECTED TO GROUP D OFFICE BUILDING. FOR INTERNAL USE ONLY. REFER TO ATTACHED ZONING CERTIFICATE. NEW TERRACE INCLUDES: NEW RAMP, RETAINING WALL, GUARDS, HANDRAILS…
NEW OUTDOOR PATIO/TERRACE CONNECTED TO GROUP D OFFICE BUILDING. FOR INTERNAL USE ONLY. REFER TO ATTACHED ZONING CERTIFICATE. NEW TERRACE INCLUDES: NEW RAMP, RETAINING WALL, GUARDS, HANDRAILS, NEW I…
Proposal to install one maglook in the basement, see the attached dwg #E-B.1.
Plumbing - Construct interior alterations for Scotiabank
Construct interior alterations for Scotiabank
HVAC - Construct interior alterations for Scotiabank
Alternative Solution It is proposed to install Automatic Systems SlimLane 950 optical portals (i.e. automatic turnstiles) in two locations, north entrance lobby and south entrance lobby of 2201 Egl…
Proposal to install 4 maglocks on the ground floor.
Plumbing - Proposal for interior renovation of entrance lobby- replacement of entranced door systems at North and South Main Entrances, removal of ceiling tiles, replacement of flooring, painting e…
Proposal for interior renovation of entrance lobby- replacement of entranced door systems at North and South Main Entrances, removal of ceiling tiles, replacement of flooring, painting existing wal…
HVAC - Proposal for interior renovation of entrance lobby- replacement of entranced door systems at North and South Main Entrances, removal of ceiling tiles, replacement of flooring, painting exist…
REVISION - to delete fire hose cabinets (building does not have a stand pipe system), pre-engineered bulkhead suspension details.Proposal for interior alterations to the convenience stair between g…
Proposal to install 3 double and 2 single maglocks on the ground floor and mezzanine of existing office building
Plumbing - Proposal for interior alterations for existing office
Proposal for interior alterations for existing office
Page numbers are hidden until the total count is available from the data service.