Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed landscape enhancements include new playground equipment, new exercise area, new community garden, two new shade pergolas, new storage shed, new walking paths, new pond feature, three new d…
Proposal For Long-Term Care Home Exterior Renovations, Exterior Parking, Line Painting and Ramp Modifications.
Proposal to install one maglock in office area in relation to permit 20 122462 00 BA.
Plumbing - Proposal for interior alterations to the ground floor of existing office. "City of Toronto - Long Term care Home"
Proposal for interior alterations to the ground floor of existing office. "City of Toronto - Long Term care Home"
HVAC - Proposal for interior alterations to the ground floor of existing office. "City of Toronto - Long Term care Home"
Solar collector to roof of long term care facility - Phase 2
To install Electromagnetic Locks to Long Term Care Facility.
Revision 01: Mechanical and Architectural Revision to Penthouse Level, Mechanical Shaft Location.HVAC - Construct new long term care home*Kipling Acres Redevelopment* - Phase 2 - new 145 bed long t…
Revision 01: Mechanical and Architectural Revision to Penthouse Level, Mechanical Shaft Location.Construct new long term care home*Kipling Acres Redevelopment* - Phase 2 - new 145 bed long term car…
Drain - Construct new long term care home*Kipling Acres Redevelopment* - Phase 2 - new 145 bed long term care home attached to existing building with same address and same owner
Plumbing - Construct new long term care home*Kipling Acres Redevelopment* - Phase 2 - new 145 bed long term care home attached to existing building with same address and same owner
HVAC - Construct new long term care home*Kipling Acres Redevelopment* - Phase 2 - new 145 bed long term care home attached to existing building with same address and same owner
Construct new long term care home*Kipling Acres Redevelopment* - Phase 2 - new 145 bed long term care home attached to existing building with same address and same owner
Revision 01 - enlarged storm water storage tank for future expansion(Site Service - Proposal to construct a new 3 storey 192 bed long term care facility with child daycare)
HVAC - Revision #1: Delete ductwork and relocate diffuser to reflect *as buildt* interior alteratations by converting existing space to a model suite on main floor for display for future new long t…
Site Service - Proposal to construct a new 3 storey 192 bed long term care facility with child daycare.
Plumbing - Proposal to construct a new 3 storey 192 bed long term care facility with child daycare.
HVAC - interior alteratations by converting existing space to a model suite on main floor for display for future new long term care facility. No new plumbing work is proposed.
Page numbers are hidden until the total count is available from the data service.