224 QUEEN ST W
REV 02: HVAC plans revised for Addition of Forced flow heater in Stair well---------------------------------------------------------------------------REV 01: HVAC plans revised for ERV unit intake …
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 02: HVAC plans revised for Addition of Forced flow heater in Stair well---------------------------------------------------------------------------REV 01: HVAC plans revised for ERV unit intake …
REVISION - HVAC plans revised for ERV unit intake and exhaust duct from roofHVAC - Proposal for interior alteration to change the use from office to pilates, yoga and wellness center.
REVISION - Plumbing plans shows the addition sump pump for one of the sinkPlumbing - Proposal for interior alteration to change the use from office to pilates, yoga and wellness center.
1 WALL SIGN**METHODFIVE**
1 Wall Sign
Proposal for interior alteration to change the use from office to pilates, yoga and wellness center.
Plumbing - Proposal for interior alteration to change the use from office to pilates, yoga and wellness center.
HVAC - Proposal for interior alteration to change the use from office to pilates, yoga and wellness center.
Install 1 first party projecting sign
HVAC - Construct interior alteations for future tenant space
Proposal for interior alterations to return the existing 2nd floor level to base building condition.
Plumbing - Construct interior alteations for future tenant space
Revision - kitchen sink. Plumbing - Interior alterations to Salad King restaurant and kitchen exhaust
Revision to the exhaust systemHVAC - Interior alterations to Salad King restaurant and kitchen exhaust
Revision - see bubbled areas.Interior alterations to existing restaurant and kitchen exhaust, for tenant Salad King.Occupant load - 140 persons.
In conjunction with a two-storey building on the premises, proposal to erect and display a wall sign and a projecting sign, both illuminated, displaying static copy at the 1st floor on the east ele…
Plumbing - Interior alterations to Salad King restaurant and kitchen exhaust
HVAC - Interior alterations to Salad King restaurant and kitchen exhaust
Interior alterations to existing restaurant and kitchen exhaust, for tenant Salad King.Occupant load - 140 persons.
HVAC - interior alterations to restaurant
Page numbers are hidden until the total count is available from the data service.