Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01: revision to permit to include the motorized smoke dampers HVAC - Proposal to construct three mixed use buildings (39, 35, and 17 storeys) with a total of 899 dwelling units and 4 level…
Proposal for interior alterations to office space.
Plumbing - Proposal for interior alterations to office space.
HVAC - Proposal for interior alterations to office space.
Conditional Permit - Proposal to construct three mixed use buildings (39, 35, and 17 storeys) with a total of 899 dwelling units and 4 levels of underground parking.
Exit stair discharge below a covered portion of the building and exit travel distance more than 9m
FS - Sprinkler and stand pipe drawings
Conditional Permit - Part Permit - Proposal to construct three mixed use buildings (39, 35, and 17 storeys) with a total of 899 dwelling units and 4 levels of underground parking.
Revision 01: plumbing inspector requested that drawing M102 be submitted to form part of existing drain permit. Drain - Proposal to construct three mixed use buildings (39, 35, and 17 storeys) with…
Conditional Permit - Part Permit - Proposal to construct three mixed use buildings (39, 35, and 17 storeys) with a total of 899 dwelling units and 4 levels of underground parking.
Pool and spa deck to provide two rescue poles (in lieu of the one rescue pole required)
HVAC - Proposal to construct three mixed use buildings (39, 35, and 17 storeys) with a total of 899 dwelling units and 4 levels of underground parking.
Drain - Proposal to construct three mixed use buildings (39, 35, and 17 storeys) with a total of 899 dwelling units and 4 levels of underground parking.
Plumbing - Proposal to construct three mixed use buildings (39, 35, and 17 storeys) with a total of 899 dwelling units and 4 levels of underground parking.
Alternative solution as per attached worksheet - standpipe
Proposed excavation and shoring for soil remeditation purpose.
Proposal to demolish the existing 3 storey office building to facilitate the future construction of a new public park and mizxed use developmetn on the lands.
Construct an addition to an existing building, for use as a temporary sales office erected on the lot for a period not exceeding 8 months (June 2017 to Feb 2018) for the sale of suites to be constr…
HVAC - Construct a temporary sales pavilion (for condo development on site) as an addition to an existing building.
Page numbers are hidden until the total count is available from the data service.