249 GARDEN AVE
REVISION - rear ground floor deck, 2nd floor balconyAlterations at basement: remove existing concrete floor, pour new concrete floor slab and retrofit drains as required, insulate and finish baseme…
Showing first 5 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION - rear ground floor deck, 2nd floor balconyAlterations at basement: remove existing concrete floor, pour new concrete floor slab and retrofit drains as required, insulate and finish baseme…
HVAC - Alterations at basement: remove existing concrete floor, pour new concrete floor slab and retrofit drains as required, insulate and finish basement perimeter walls, install new 3-pc bathroom…
Alterations at basement: remove existing concrete floor, pour new concrete floor slab and retrofit drains as required, insulate and finish basement perimeter walls, install new 3-pc bathroom, insta…
Drain - Alterations at basement: remove existing concrete floor, pour new concrete floor slab and retrofit drains as required, insulate and finish basement perimeter walls, install new 3-pc bathroo…
Plumbing - Alterations at basement: remove existing concrete floor, pour new concrete floor slab and retrofit drains as required, insulate and finish basement perimeter walls, install new 3-pc bath…
End of list for these filters.
Updated Nov 16, 2026