256 EGLINTON AVE E
Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of…
Revision 01 - additional bollardConstruction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance buildin…
Protection of Standpipe Systems at all Stations
Interior alterations for the installation fo the future Presto Faregates to the Mt. Pleasant station
Provide edge installation for bollard barriers
FS - Sprinkler Shop Drawing - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance building …
Conditional Permit - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance building at 280-28…
Conditional Permit - Part Permit - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance buil…
Conditional Permit - Drain - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance building a…
Plumbing - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance building at 280-282 Eglinton…
HVAC - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance building at 280-282 Eglinton Ave…
Foundation Inside Drain - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance building at 2…
Conditional Permit - Part Permit - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT. Scope includes main entrance building at 256 Eglinton Ave E, and secondary entrance buil…
Egress requirements from service rooms and spaces
Two double stacked trailers to be installed on Rawlinson Ave for the construction of Mount Pleasant Station for the Eglinton LRT.
Plumbing - Two double stacked trailers to be installed on Rawlinson Ave for the construction of Mount Pleasant Station for the Eglinton LRT.
Two double stacked trailers to be installed on Rawlinson Ave for the construction of Mount Pleasant Station for the Eglinton LRT.
Conditional Permit - Part Permit - Construction of the Mount Pleasant Station of the Eglinton Crosstown LRT
Demolition of existing building for the future Service Building to the Eglinton LRT Line
Proposal to install a 2" back flow preventer in existing multiple unit building.