Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
1 overhanging structure sign**SIMONS**
REV 1: PER ATTACHED DETAIL SHEETHVAC - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical du…
REV 1: PER ATTACHED DETAIL SHEETProposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanical ductwork …
REV 1: PER ATTACHED DETAIL SHEETPlumbing - Proposal for Alteration of existing retail suite, new internal partitions, doors and hardware, storefronts and finishes. Alterations to existing mechanica…
Revision: see Mechanical¿s Memo in drawing set
1 wall sign + 1 overhanging structure sign**EATALY**
Rev 03 - Alterations to an existing storage space at the Toronto Eaton Centre converted to an office area for the Toronto Police Services.Rev 02 - Revised plansPlumbing - Proposed alterations to ex…
Rev 04 - Alterations to an existing storage space at the Toronto Eaton Centre converted to an office area for the Toronto Police Services.Rev 03 - Revised plansRevision #01 - Proposed alterations a…
Rev 03 - Alterations to an existing storage space at the Toronto Eaton Centre converted to an office area for the Toronto Police Services.Rev 02 - Revised plansRevision #01 - Proposed alterations a…
Signage master plan required for permit application 2025 158205 SGN 00 SP / DST 00 DS.Four of the signs require a variance.
2 Projecting Signs on the third storey, east elevation and 2 wall signs, third storey,one on the east and one on the south elevation. (Approved as per variance # 25-173005)3 Wall Signs on the first…
Proposed addition of Fire Hose Cabinet in sales area, fitting room adjustment (removed few stalls added more sales area), and new Fan coil unit in staff lounge.
HVAC - Proposed addition of Fire Hose Cabinet in sales area, fitting room adjustment (removed few stalls added more sales area), and new Fan coil unit in staff lounge.
This Alternative Solution addresses the approach developed to permit the vertical stair opening within the Nike - Rise suite (CRU 300/A038S on Levels 3 and 4 of the Toronto Eaton Centre (TEC) locat…
Revision 01 - see cover letter attached to drawingsNew tenant - Proposed interior/exterior alerations
Revision 01 - see cover letter attached to drawingsHVAC - New tenant - Proposed interior/exterior alerations
Rev 03 - Revised plansRevision #01 - Proposed alterations and renovations to re-demise the existing space at the Toronto Eaton Centre occupied by Nordstrom on Levels 3, 4 and 5 back to Base Buildin…
Rev 02 - Revised plansPlumbing - Proposed alterations to existing space on levels 3, 4, & 5 back to base building, including the dmeolition of existing facade for future tenant facades.
1 Roof Sign
Page numbers are hidden until the total count is available from the data service.