125 QUEENS QUAY E
Standalone Shoring and Excavation for Remediation purposes.
Some text filters were temporarily ignored because the data service timed out.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Standalone Shoring and Excavation for Remediation purposes.
Proposed underpinning to existing commercial building. (60 linear meters)
Conditional permit application for model A1 left side - 18 206917 B01 00 NH
To construct Foundation for a 12 Story Condo as well as Drain Permit
Proposed underpinning to existing commercial building. (60 linear meters)
Supply and Installation of free-standing Rack and Shelf storage system as per 3.16 of the OBC. Intended use is for the storage of merchandise.
Deferred Fees from folder 26 235487 (RSN-5915828) ZoningProcess RSN 80659125
Proposal to construct a new 16' sliding window/door at rear of the main floor.
Proposal to legalize existing rear canopy. Overhead, roof-like structure with open sides to cover patio and entrance of the backyard. Order to Comply # 26 246041 WNP 00 VI Issued on September 29, 2…
Proposal for removal of existing load bearing wall, removal and relocation of existing stair header and trimmer, along with new post and footing in basement associated with stair
Backwater valve installation
Back water valve and sump pump installation
Proposal to upgrade the Fire Alarm audibility with horn/strobes and provide new pull stations at exits.
Conditional Permit - Proposal to construct a new 57 storey mixed use building with 445 residential units, ground floor retail and 4 levels underground parking. See also 22 164002 DEM and 21 152905 …
Revision 02: Removal and addition of interior walls, Removal and/or relocation of interior doors. Fire-rating of the stairwell walls and doors between the basement and first floor. Relocation and/o…
Deferred Fees from folder 26 190308 (RSN-5864936) ZoningProcess RSN 80166864
REV: Completion of ground and lower ground level commercial retail areasProposed construction of new 12-storey building with 186 residential units, 2 levels of retail use (Ground Floor and Level B1…
REV HVAC - Completion of ground and lower ground level commercial retail areasProposed construction of new 12-storey building with 186 residential units, 2 levels of retail use (Ground Floor and Le…
REV Plumbing - Completion of ground and lower ground level commercial retail areasProposed construction of new 12-storey building with 186 residential units, 2 levels of retail use (Ground Floor an…
REV 01: Revision to the permit to include additional underpinning, a second residential unit, and an enlarged additionProposal to construct second and third storey addition to existing Single Famil…