2672 BLOOR ST W
REVISION 03 - Shoring and Excavation Work To Add Two New Elevators To The Existing Station.REVISION 02 - Revision work involves shoring and micropile work as the excavation support systemREVISION 0…
Showing first 17 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 03 - Shoring and Excavation Work To Add Two New Elevators To The Existing Station.REVISION 02 - Revision work involves shoring and micropile work as the excavation support systemREVISION 0…
REVISION 02 - Revision work involves shoring and micropile work as the excavation support systemREVISION 01 - Proposed changes the building permit documentation include the location and constructio…
REVISION 01 - Proposed changes the building permit documentation include the location and construction assembly of the south wall. The south wall has shifted north into the corridor and the assembl…
Address the size of the elevator cab E2 accessing the South (Eastbound) platform - Old Mill Station Line 2See 22-141727 BA
Plumbing - To add 2 new elevators to TTC's Old Mill Station to accommodate Accessibility_ 110 m2 above garde and 148 m2 below grade
Site Services - To add 2 new elevators to TTC's Old Mill Station to accommodate Accessibility_ 110 m2 above garde and 148 m2 below grade
HVAC - To add 2 new elevators to TTC's Old Mill Station to accommodate Accessibility_ 110 m2 above garde and 148 m2 below grade
To add 2 new elevators to TTC's Old Mill Station to accommodate Accessibility_ 110 m2 above garde and 148 m2 below. Shoring for excavation 37 mSee 22-141983 ALT
Drain - To add 2 new elevators to TTC's Old Mill Station to accommodate Accessibility_ 110 m2 above garde and 148 m2 below grade
Plumbing - Replacement of water meter and installation of three (3) backflow preventers. Connections to supervisory valves to fire alarm panel.
Replacement of water meter and installation of three (3) backflow preventers. Connections to supervisory valves to fire alarm panel.
Drain - Replacement of water meter and installation of three (3) backflow preventers. Connections to supervisory valves to fire alarm panel.
Replacement of water meter and installation of three (3) backflow preventers. Connections to supervisory valves to fire alarm panel.
Proposal for interior alterations to existing transit station. Scope of work includes replacing legacy turnstiles with Presto faregates - Old Mill Subway Station
Alteration for a guard rail, roof stairs retaining wall light weight concrete wall replacement to Toronto Transit Subway Station.
HVAC - Alteration for a guard rail, roof stairs retaining wall light weight concrete wall replacement to Toronto Transit Subway Station.
To replace existing doors with barrier free doors at street level / bus platform - "Old Mill Station"