Showing first 14 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 03: Revision to Zone B (new windows, update to cladding/glazing area).Zone A - extensive interior renovation through basement, ground and second floor. Rebuilding of a third floor (third floor …
Rev 02 - SI 35R1 describes revision to Fire Alarm Panel Remote Annunciator panel location adjacent to fire fighters entrance. This is based on product literature supplied by the contractor confirmi…
Revision 01: Relocation of the existing Fire Alarm Control Panel from the existing basement boiler room to a new first floor electrical room. Zone A - extensive interior renovation through basement…
FS - Sprinkler Shop Drawing - Zone A - extensive interior renovation through basement, ground and second floor. Rebuilding of a third floor (third floor destroyed by fire). Front vestibule addition…
Plumbing - PHASE TWO AND THREE - YORK MEMORIAL COLLEGIATE INSTITUTE Extensive renovations and repairs to York Memorial Collegiate Institute due to damage from fire. Improvements include selective d…
Zone A - extensive interior renovation through basement, ground and second floor. Rebuilding of a third floor (third floor destroyed by fire). Front vestibule addition on the ground level. Rear can…
HVAC - PHASE TWO AND THREE - YORK MEMORIAL COLLEGIATE INSTITUTE Extensive renovations and repairs to York Memorial Collegiate Institute due to damage from fire. Improvements include selective demol…
Installation of a rooftop photovolyaic arrry on an existing building - York Menorial C1
Reroute approx 5m of water pipe to avoid the upcoming installation of the concrete caisson wall under another permit. All rerouting work occurs on Metrolinx property. The water lines feed the nearb…
Interior alterations to convert an existing storage space to an electrical (service) room, install new exterior door to Education Centre located within existing secondary school.
HVAC - Interior altertions to an existing chemical storage / office room in a secondary school. The alterations will create two separate rooms: one for chemical storage and one for office.
Interior altertions to an existing chemical storage / office room in a secondary school. The alterations will create two separate rooms: one for chemical storage and one for office.
Plumbing - Interior altertions to an existing chemical storage / office room in a secondary school. The alterations will create two separate rooms: one for chemical storage and one for office.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.