Proposal for site servicing plan was revised to include removal and replacement of problematic areas to avoid future drainage issues.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for site servicing plan was revised to include removal and replacement of problematic areas to avoid future drainage issues.
2 Wall Sign
REV 03: Revision to Zone B (new windows, update to cladding/glazing area).Zone A - extensive interior renovation through basement, ground and second floor. Rebuilding of a third floor (third floor …
Rev 02 - SI 35R1 describes revision to Fire Alarm Panel Remote Annunciator panel location adjacent to fire fighters entrance. This is based on product literature supplied by the contractor confirmi…
Revision 01: Relocation of the existing Fire Alarm Control Panel from the existing basement boiler room to a new first floor electrical room. Zone A - extensive interior renovation through basement…
FS - Sprinkler Shop Drawing - Zone A - extensive interior renovation through basement, ground and second floor. Rebuilding of a third floor (third floor destroyed by fire). Front vestibule addition…
HVAC - PHASE TWO AND THREE - YORK MEMORIAL COLLEGIATE INSTITUTE Extensive renovations and repairs to York Memorial Collegiate Institute due to damage from fire. Improvements include selective demol…
Plumbing - PHASE TWO AND THREE - YORK MEMORIAL COLLEGIATE INSTITUTE Extensive renovations and repairs to York Memorial Collegiate Institute due to damage from fire. Improvements include selective d…
Zone A - extensive interior renovation through basement, ground and second floor. Rebuilding of a third floor (third floor destroyed by fire). Front vestibule addition on the ground level. Rear can…
Fire Damage: Repair, removal for salvage and partial rebuilding of designated facade in preparation for the rebuilding of the third level that will be covered under a separate permit. - York Memori…
REV-01 to permit 19-238198 BLD: Fire Damage: extended phase 1: addressing smoke contaminated clay tile blocks in the front facade (south elevation) of the building including additional structural s…
Replaced fire alarm annunciator panel and fire alarm bells to horns.
Proposal for a temporary boiler system to be installed.
Proposal for guards at existing fire escape, fire separation at administration building, fire alarm system
Proposal to salvage vital heritage components from imminent collapse at the third level front facade (south elevation) of the building due to fire damage. Work includes utilizing the third level pl…
Proposal for interior alterations to replace doors within an existing secondary school - "York Memorial CI" Installation of new electromagnetic locks.***(correction - permit included the installati…
Installation of a rooftop photovolyaic arrry on an existing building - York Menorial C1
Interior alterations to decommission 1 interior door at D.01 and to use existing interior retrofitted door (D.02) and create new exterior door (D0.4) for new travel exit.
Reroute approx 5m of water pipe to avoid the upcoming installation of the concrete caisson wall under another permit. All rerouting work occurs on Metrolinx property. The water lines feed the nearb…
HVAC - Interior alterations to convert an existing storage space to an electrical (service) room, install new exterior door to Education Centre located within existing secondary school.