Showing first 18 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Proposed interior alterations to create temporary sales office
Proposed interior alterations to create temporary sales office
Rev 06 - Removal of the level 2 amenity Mag LocksDemolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
REVISION#5 To remove the circular staircase from ground floor to second floor and changed the layout of the CACF room. Demolition of existing vacant building and construction of a new 9 storey resi…
REVISION#4: REVISIONS TO MECHANICAL PENTHOUSE DOORDemolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
Revision to exhaust directly to exterior from the sub electric room in P1HVAC - Demolition of existing vacant building and construction of a new 9 storey residential condominium with retail at grou…
Rev 3: Applied to clear OTC from inspectionsDemolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
Rev 02: Revision to clarify insulationRevisions to sprinkler/fire systems review to existing permitDemolition of existing vacant building and construction of a new 9 storey residential condominium …
Revisions to sprinkler/fire systems review to existing permitDemolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
Proposed sprinklers revision to permit 18-104244 FSU 0 FS.
Revision to layout of drains.Drain - Demolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level. Drains through Foundation walls.
Drain - Demolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level. Drains through Foundation walls.
Drain - Demolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
Plumbing - Demolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
HVAC - Demolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground level
Demolition of existing vacant building and construction of a new 9 storey residential condominium with retail at ground levelPartial occupancy of par of P3 - 4th Floor 21139902AOPartial Occupancy p…
Tenant fit out to existing vacant space.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.