283 EUCLID AVE
Revision: Providing a guard at the second floor balcony's sliding door to change the second storey front balcony to a porch canopy with no access
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision: Providing a guard at the second floor balcony's sliding door to change the second storey front balcony to a porch canopy with no access
Revision 03 - HVAC changed to high velocity systemREVISION 2 - Adding missing structural members, changing the use of some of the spaces, and modifying some of the windows and doors.
REVISION 2 - Adding missing structural members, changing the use of some of the spaces, and modifying some of the windows and doors.
REVISION 2 - Adding missing structural members, changing the use of some of the spaces, and modifying some of the windows and doors.
REVISION - original permit drawings missed that load bearing walls are being removedHVAC - Proposal to finish basement, reconfiguration of the staris and floors.
REVISION - original permit drawings missed that load bearing walls are being removedProposal to finish basement, reconfiguration of the staris and floors.
Plumbing - Proposal to finish basement, reconfiguration of the staris and floors.
HVAC - Proposal to finish basement, reconfiguration of the staris and floors.
Proposal to finish basement, reconfiguration of the staris and floors.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.