285-297 DANFORTH AVE
Revision 01 - Mechanical schedules, relocate FCU-1 from service area room to the universal washroom, laundry (see attached letter for full revision list)HVAC - Construct an eight (8) storey mass ti…
Showing first 17 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01 - Mechanical schedules, relocate FCU-1 from service area room to the universal washroom, laundry (see attached letter for full revision list)HVAC - Construct an eight (8) storey mass ti…
Revision 01 - as reference to the AS folderTo construct an eight-storey mass timber mixed use building, which will retain elements of the existing church. The proposal will consist a mix of 32 dwel…
FS - Sprinkler Shop Drawing - Renovation of retained church space in relation to the new residential building(24 232431 BLD 00 NB).
Revision 01 - include the remove and replace damaged roof sheathing.Proposal for partial demolition of the rear 2/3rds of the existing structure. Retention of eastern tower and front 3rd of the exi…
Plumbing - Renovation of retained church space in relation to the new residential building(24 232431 BLD 00 NB).
Renovation of retained church space in relation to the new residential building(24 232431 BLD 00 NB).
HVAC - Renovation of retained church space in relation to the new residential building(24 232431 BLD 00 NB).
Part Permit - Construct an eight (8) storey mass timber building with 50 affordable seniors residence.
Site Services - Construct an eight (8) storey mass timber building with 50 affordable seniors residence.
HVAC - Construct an eight (8) storey mass timber building with 50 affordable seniors residence.
Drain - Construct an eight (8) storey mass timber building with 50 affordable seniors residence.
Plumbing - Construct an eight (8) storey mass timber building with 50 affordable seniors residence.
To construct an eight-storey mass timber mixed use building, which will retain elements of the existing church. The proposal will consist a mix of 32 dwelling units and 18 dwelling rooms, all which…
ZR - Planning Revision Folder Site Plan Approval for proposed eight-storey mass timber mixed use building, which will retain elements of the existing building. The proposal will consist a mix of dw…
Project work to include drilling of boreholes, lateral tie-ins, manifolds, and pumping for geo-exchange system at 60 Bowden - work to be completed post partial
Proposal for partial demotion of the rear 2/3rds of the existing structure. Retention of eastern tower and front 3rd of the existing church.
Install HVAC - ductwork, 3 rooftop units, also 1 boiler and 3 units for forced-air gas furnace.(60 Bowden St is convenience address) Peter Kazmarek is familiar. (old w25/new30)
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.