Revision 04: revised drawings. REV 02: Revision to sprinkler system.Proposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing…
Rev 05 - Interior updates to peri-operative and Anesthesia classroom. Extended DW5C fit up.REVISION 4 - minor alterations at DW5C levelHVAC - Proposal for interior alterations to on 5th floor - Don…
Rev 05 - Interior updates to peri-operative and Anesthesia classroom. Extended DW5C fit up.REVISION 4 - minor alterations at DW5C levelPlumbing - Proposal for interior alterations to on 5th floor -…
Rev 05 - Interior updates to peri-operative and Anesthesia classroom. Extended DW5C fit up.REVISION 4 - minor alterations at DW5C levelProposal for interior alterations to on 5th floor - Donnelly W…
Convert Rm 4 072B, Donnelly Wing of St. Michael's Hospital into an accessible washroom to support on call staff.
Plumbing - Convert Rm 4 072B, Donnelly Wing of St. Michael's Hospital into an accessible washroom to support on¿call staff.
HVAC - Convert Rm 4 072B, Donnelly Wing of St. Michael's Hospital into an accessible washroom to support on¿call staff.
A sign permit to erect and display 1 overhanging structure sign + 4 wall signs, all displaying static copy.**THE SLAIGHT FAMILY EMERGENCY DEPARTMENT**
REVISION 3 - Revision to permit to remove the maglock from Door CN-L-B2AAdd 32 electromagnetic locks in Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1. Building p…
Proposal to provide F-K-5-1-12 Clean Agent System to Serve Hub Rooms and Electrical Rooms, and to provide fire alarm devices in 10th floor Existing Data Centre 10-183 and UPS room 10-184 and connec…
Rev 03: see cover letterRev 02: see cover letterREV 01: as per Builidng Inspector Deficiency request, see cover letter for scope HVAC - Proposal to construct a 2-storey addition to existing hospita…
Rev 02: see cover letterRev 01: see cover letterProposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new…
Rev 02: see cover letterRev 01: see cover letterPlumbing - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and const…
Revision 02: Revision to permit to remove the maglock from Door CN-L-B2AAdd 32 electromagnetic locks in Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1. Building p…
REV 02: Revision to sprinkler system.Proposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wing renovation area L1
REVISION 02 - revised sprinkler layoutREVISION 01 - revised permit setProposal for a new Fire Sprinkler System in an existing hospital - Shuter Tower (levels B3 to L3) and in the Cardinal Carter Wi…
Rev 01: see cover letterPlumbing - Proposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing)…
Rev 02: see cover letterREV 01: as per Builidng Inspector Deficiency request, see cover letter for scope HVAC - Proposal to construct a 2-storey addition to existing hospital. Scope of work include…
Rev 01: see cover letterProposal to construct a 2-storey addition to existing hospital. Scope of work includes demolishing existing 6 storey Shuter Wing and constructing new Shuter Wing. See STE 16…