330 HUMBERLINE DR
Revision 01 - to 19-208984 as per bubbled drawingsProposal to construct interior alterations to existing industrial warehouse including new truck doors and 4 loading ramps.
Showing first 17 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01 - to 19-208984 as per bubbled drawingsProposal to construct interior alterations to existing industrial warehouse including new truck doors and 4 loading ramps.
Revision 01 to 19-208984 as per bubbled drawings HVAC - Existing industrial warehouse alteration
HVAC - Existing industrial warehouse alteration
Drain - Existing industrial warehouse alteration
Plumbing - Existing industrial warehouse alteration
Proposal to construct interior alterations to existing industrial warehouse including new truck doors and 4 loading ramps.
Revision to mechanical system layout.HVAC - Interior alterations for new tenant. Storage for pallets *CHEP* Create new corridor. New openings and infill in exterior walls. New rooftop and makeup ai…
Revision # 01 - Changes made to plans *See Attached Drawings*Door replacement with fire rated doors.
Interior alterations for new tenant. Storage for pallets *CHEP* Create new corridor. New openings and infill in exterior walls. New rooftop and makeup air units on roof. Upgrade sprinklers. No plum…
HVAC - Interior alterations for new tenant. Storage for pallets *CHEP* Create new corridor. New openings and infill in exterior walls. New rooftop and makeup air units on roof. Upgrade sprinklers. …
Install (1) maglock to stairwell at first floor level and release key switch at main entrance
Proposed backflow prevention device to be installed in existing apartment building.
Site servicing to existing industrial building: manhole and catch basins.
installation of a new demising wall and 5 new loading docks
Sprinklers on entire main floor *Polyair*
Upgrade fire alarm system to entire floor space (industrail space and office space)Dec. 11l/06-revised drawings submitted for fire alarm upgrading
Upgrade fire alarm system to entire floor space (industrail space and office space)
End of list for these filters.
Updated Nov 15, 2026