30 WELLINGTON ST W
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.HVAC - Proposed interior alterations to an existing office
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.HVAC - Proposed interior alterations to an existing office
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.Plumbing - Proposed interior alterations to an existing office
Revision 01 - to provide 2 hour rated shaft wall where refrigerant lines are being installed.Proposed interior alterations to an existing office
REV 01: Revision to floor plans, notes and details.Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
REV 01: Revision to floor plans, notes and details.Plumbing - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
REV 01: Revision to floor plans, notes and details.HVAC - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Proposal to install Back Water Valve
Plumbing - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
HVAC - Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Floors 8 & 9 are being taken back to base with new washrooms, Floor 10 is HVAC upgrades only
Proposed interior alterations back to base - taking the old Druxys space and bringing it back to base building standards for future project.
Plumbing - Proposed interior alterations to an existing office
HVAC - Proposed interior alterations to an existing office
Proposed interior alterations to an existing office
REV 01 : Back to Base and Washroom Renovation Floor 5Plumbing - Proposal for Back to Base and Washroom Renovation Floor 5
REV01 : Revision to HVAC - PERMIT #24 200675 HVA/PLBHVAC - Proposal for Back to Base and Washroom Renovation Floor 5
Proposal to install 3 stairwell maglocks.
Proposal to install 3 single maglocks on 2, 3 single maglocks on 3 and 3 single maglocks on 4 at the stairwell doors.
HVAC - Proposal for Back to Base and Washroom Renovation Floor 5
Plumbing - Proposal for Back to Base and Washroom Renovation Floor 5
Page numbers are hidden until the total count is available from the data service.