Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - INTERIOR RENOVATION OF EXISTING OFFICE ON MULTI-TENANT FLOOR
HVAC - INTERIOR RENOVATION OF EXISTING OFFICE ON MULTI-TENANT FLOOR
Interior alterations - Unit 630 & 680
HVAC - Interior alterations - Unit 630 & 680
Revision 02: Revision for additional 5 floors.HVAC Revision 01 - Revised Drawings for Mechanical Permit Drawings for Corridor CSF/D DeletionProposal for the construction of a 29 storey tower contai…
Revision 01: For additional 5 floors.Plumbing - Proposal for the construction of a 29 storey tower containing 20,055 square metres of residential space and 6,509 square metres of non-residential sp…
Part Permit - Proposal for the construction of a 29 storey tower containing 20,055 square metres of residential space and 6,509 square metres of non-residential space. Application is in conjunction…
Proposed interior alterations including HVAC, Plumbing, Sprinkler, fire alarm modification, and addition of commerical kitchen exhaust system.
Plumbing - Proposed interior alterations including HVAC, Plumbing, Sprinkler, fire alarm modification, and addition of commerical kitchen exhaust system.
HVAC - Proposed interior alterations including HVAC, Plumbing, Sprinkler, fire alarm modification, and addition of commerical kitchen exhaust system.
Proposal for localized underground garage repairs to an existing commercial building.
Part Permit - Proposal for the construction of a 29 storey tower containing 20,055 square metres of residential space and 6,509 square metres of non-residential space. Application is in conjunction…
Plumbing - Proposal to update suite layout to accommodate tenant's current requirements.
Proposal to update suite layout to accommodate tenant's current requirements.
HVAC - Proposal to update suite layout to accommodate tenant's current requirements.
HVAC Revision 01 - Revised Drawings for Mechanical Permit Drawings for Corridor CSF/D DeletionProposal for the construction of a 29 storey tower containing 20,055 square metres of residential space…
HVAC - INTERIOR ALTERATION - LANDLORD'S BACK TO BASE AND TENANT OFFICE BUILD-OUT
Interior alterations to office suites 1100a & 1100b to restore demising wall between units
HVAC - Proposal to construct interior alterations for the creation of a salon.
Page numbers are hidden until the total count is available from the data service.