310 HUMBERLINE DR
HVAC - Tenant improvement work for designated office and storage areas - PHASE 1 - DC7 Phase 2C
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
HVAC - Tenant improvement work for designated office and storage areas - PHASE 1 - DC7 Phase 2C
Tenant improvement work for designated office and storage areas - PHASE 1 - DC7 Phase 2C
REVISION - as per the drawingsPlumbing - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
REVISION - as per the drawingsHVAC - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
REVISION - Combined interior data halls 7&8 to be one large data hall 7, enlarged data halls 5&6 and relocate corridors 111&112, eliminated storage room 121, modified size of tenant storage room 12…
install 3 maglocks on high security doors in Phase 2 side of facility
Revision #01 - Plumbing - Changes to add a duplex grinder pump systemPlumbing - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
Revision #01 - Washrooms and maglocks have been removed and the area of interior alteration has been increased. Plumbing - Tenant improvement work for designated office and storage areas in an exis…
REV 01 - Changes as per drawing Maglock location has been modified. Proposal to install 1 magnetic lock related to the installation of a new door
Revision #01 - Washrooms and maglocks have been removed and the area of interior alteration has been increased.Tenant improvement work for designated office and storage areas in an existing industr…
Revision #01 - Washrooms and maglocks have been removed and the area of interior alteration has been increased.HVAC - Tenant improvement work for designated office and storage areas in an existing …
Proposal to install 1 magnetic lock related to the installation of a new door
HVAC - Tenant improvement work for designated office and storage areas in an existing industrial building
Tenant improvement work for designated office and storage areas in an existing industrial building
Plumbing - Tenant improvement work for designated office and storage areas in an existing industrial building
Proposal to install six magnetic lock on high security doors within the existing facility on existing doors.
Revision # 02 - To use stainless steel piping as per 19-171536 ALT 00 AS.Revision to plumbing see attached for description. Deleted HRV 4 and added individual HVAC units for Data Centres with assoc…
Proposal to use 10 gauge 304 stainless steel with welded joints for the rain water leaders. As per permit application 18-207287 PLB 01.
ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING. PHASE 2
Drain - ADD NEW DATA CENTRE TO EXISTING INDUSTRIAL BUILDING.PHASE 2
Updated Nov 17, 2026