32 BABY POINT CRES
Revision 01: The full design of standalone garage at the rear of the site. New foundation work is provided to remedial work to existing site condition and to meet the requirements of OBC 2024. The …
Showing first 9 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01: The full design of standalone garage at the rear of the site. New foundation work is provided to remedial work to existing site condition and to meet the requirements of OBC 2024. The …
Proposal to restore existing structural components and construct new mezzanine addiiton on existing detached garage
Proposal to restore the garage and mezzanine structure.
proposing restoration of an existing garage, and add storage above the garage
Restoration of exissting garage.
Rev 01: Addition to second floor and third floor. Extend second floor to match main, expand 3rd floor dormers, convert 3rd floor living space to atticProposal for multiple projects to an existing 3…
Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition (west), front dormer additions on the 3rd floor, interior alterations, …
HVAC - Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition (west), front dormer additions on the 3rd floor, interior altera…
Plumbing - Proposal for multiple projects to an existing 3 storey SFD-detached dwelling. Scope of work includes a 2 storey side addition (west), front dormer additions on the 3rd floor, interior al…
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.