325 HUMBER COLLEGE BLVD
Plumbing - 1) Installation of new platform2) Installation of sprinkler system related to new platform installation3) Installation of an 'infill platform' and access stair4) Electrical: install life…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - 1) Installation of new platform2) Installation of sprinkler system related to new platform installation3) Installation of an 'infill platform' and access stair4) Electrical: install life…
HVAC - 1) Installation of new platform2) Installation of sprinkler system related to new platform installation3) Installation of an 'infill platform' and access stair4) Electrical: install life saf…
1) Installation of new platform2) Installation of sprinkler system related to new platform installation3) Installation of an 'infill platform' and access stair4) Electrical: install life safety sig…
Application for a permit to erect and display one first party illuminated wall sign, displaying static copy erected at the first storey on north elevation.Dimensions:0.61m l x 0.61m W x 0.1m D at a…
Application for a permit to erect and display one first party illuminated overhanging structure sign, displaying static copy, erected at the first storey on north elevation of the building at above…
HVAC - Proposal for interior fit out (120 Sq.M) as flagship retail area for Purolator customer interface hub.
Application for a permit to erect and display six non-illuminated ground signs.*****PUROLATOR*****
Proposal for interior fit out (120 Sq.M) as flagship retail area for Purolator customer interface hub.
Proposal for alterations of interior equipment & service platforms.
Revision 02: construction of two (2) pre-fabricated security guardhouses (Guardhouses 1 & 2), each (10'0" x 12'0") with an area of 11.15sm.
Revision for the construction of two (2) pre-fabricated security guardhouses (Guardhouses 1 & 2), each (10'0" x 12'0") with an area of 11.15sm.
Revision 01: architectural, structural revisions to two single storey industrial facilities.
Proposal: In the subject building, the travel distance on an elevated platform levels (shelf and rack storage system) to the ground floor, including travel distance along unenclosed stairs exceed 4…
To erect and display two ground signs and two wall signs, all illuminated.****PUROLATOR****
Revision 01: to update civil drawings due to unforeseen site conditions and in accordance with recent approval by the City of Toronto development engineering department.Drain - Single storey indust…
Alternative solution for extended travel distance timed exit analysis for shelf and rack storage system in a single storey industrial facilities for Purolator.
HVAC - Single storey industrial facilities. Main Building 29802m2, Transportation Building 631m2.
Single storey industrial facilities for Purolator. Main Building 29802m2, Transportation Building 631m2.
Plumbing - Single storey industrial facilities. Main Building 29802m2, Transportation Building 631m2.
Drain - Single storey industrial facilities. Main Building 29802m2, Transportation Building 631m2.
Page numbers are hidden until the total count is available from the data service.