Interior alterations to 2nd and 3rd floor
Rev 03 - 1. The 1 hr fire-rating has been removed from the Water Meter Room 1001 on Level 1, as this is not required as per OBC 9.10.10.3 Separation of Service Rooms as this building is sprinklered…
Rev 03 - 1. The 1 hr fire-rating has been removed from the Water Meter Room 1001 on Level 1, as this is not required as per OBC 9.10.10.3 Separation of Service Rooms as this building is sprinklered…
REVISION 04.- 1. The 1 hr fire-rating has been removed from the Water Meter Room 1001 on Level 1, as this is not required as per OBC 9.10.10.3 Separation of Service Rooms as this building is sprink…
REVISION - clarify the main domestic cold water service connection to the existing water servicePlumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from groun…
Drain - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second floor. Second floor addition for storage and utility rooms.
Rev 02 - Proposal to revise interior alterations for suite 700 & 800 to combine into one unitRevision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space …
Rev 02 - Proposal to revise interior alterations for suite 700 & 800 to combine into one unitRevision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space …
Rev 02 - Proposal to revise interior alterations for suite 700 & 800 to combine into one unitRevision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space …
Revision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space into an eight unit office building. HVAC - Remove part of the east ground floor for (8) new p…
Revision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space into an eight unit office building. Plumbing - Remove part of the east ground floor for (8) n…
Revision#1: Proposal to revise the interior alterations to convert existing industrial/commercial space into an eight unit office building. Addition of the floor between ground and 2nd floor. Three…
Plumbing - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second second floor. Second floor shell addition for storage and utility rooms. New f…
HVAC - Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second second floor. Second floor shell addition for storage and utility rooms. New furna…
Remove part of the east ground floor for (8) new parking spaces. (2) new stairs from ground floor to second floor. Second floor addition for storage and utility rooms.