Showing first 14 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Part Permit - Construct new tower A, 27 stories with 3 levels of underground parking, retail at-grade & 345 dwelling units.**** below grade reduced to 3 levels in the latest re-submission drawings …
Alternative Solution Application- Waiver of combination smoke/fire dampers in air ducts
Alternative Solution to permit t the use of 65mm standpipe hose valves in exit stairs in lieu of fire hose cabinets containing 65mm and 38mm hose valves with 38mm fire hoses within the floors havin…
Part Permit - Construct new tower A, 26 stories with 4 level parking garage below grade
Proposal for shoring and excavation for the purpose of soil remediation.
Construct new residential condominium tower B, 30 stories**** below grade reduced to 3 levels in the latest re-submission drawings of Jan 5th, 2024 shoring permit to be revised - soil report / geoh…
Construct new tower A, 27 stories with 3 levels of underground parking, retail at-grade & 345 dwelling units.**** below grade reduced to 3 levels in the latest re-submission drawings of Jan 5th, 20…
HVAC - Construct new residential condominium tower B, 30 stories
Drain - Construct new tower A, 26 stories with 4 level parking garage below grade
Plumbing - Construct new residential condominium tower B, 30 stories
Plumbing - Construct new tower A, 26 stories with 4 level parking garage below grade
Drain - Construct new residential condominium tower B, 30 stories
HVAC - Construct new tower A, 26 stories with 4 level parking garage below grade
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.