350 KIPLING AVE
NEW EXTERIOR RAMP TO ACCESSIBLE ENTRANCE. NEW ELEVATOR WITH ENCLOSURE AND NEW UNIVERSAL TOILET ROOM. NEW DOOR OPERATORS AND HOLD OPEN DEVICES
Showing first 13 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
NEW EXTERIOR RAMP TO ACCESSIBLE ENTRANCE. NEW ELEVATOR WITH ENCLOSURE AND NEW UNIVERSAL TOILET ROOM. NEW DOOR OPERATORS AND HOLD OPEN DEVICES
HVAC - NEW EXTERIOR RAMP TO ACCESSIBLE ENTRANCE. NEW ELEVATOR WITH ENCLOSURE AND NEW UNIVERSAL TOILET ROOM. NEW DOOR OPERATORS AND HOLD OPEN DEVICES
Plumbing - NEW EXTERIOR RAMP TO ACCESSIBLE ENTRANCE. NEW ELEVATOR WITH ENCLOSURE AND NEW UNIVERSAL TOILET ROOM. NEW DOOR OPERATORS AND HOLD OPEN DEVICES
Proposal to install a temporary air supported structure; Seasonal Dome - Lakeshore Collegiate Sports Centre, from October 2026 to April 2027.See also 25 266729 WNP
Site services relating to 350 Kipling Ave - TS - 22-136166 add sump pump and manhole
HVAC - Install Air Supported Structure - Lakeshore Collegiate Sports Centre, May 2022 - October 2022
HVAC - Proposed interior alterations to washrooms, storage rooms and change rooms on ground floor of existing secondary school.
HVAC - Interior alterations to existing secondary school to create new woodworking shop.
Plumbing - Interior alterations to existing secondary school to create new woodworking shop.
Repair of existing concrete ceiling and reclad ext. walls along east/west sides of driveway
Plumbing - Interior Alterations to an existing Secondary School to create a new Chemistry Laboratory. - Interior Alterations
HVAC - Interior Alterations to an existing Secondary School to create a new Chemistry Laboratory. - Interior Alterations
Interior Alterations to an existing Secondary School to create a new Chemistry Laboratory.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.