3500 EGLINTON AVE W
REV 01 - Revision to STSDrain - Construct the maintenance and storage facility for the Eglinton Crosstown LRT
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV 01 - Revision to STSDrain - Construct the maintenance and storage facility for the Eglinton Crosstown LRT
REV 01: Office quality of life improvements. Install t-bar ceilings with adjustments made to HVAC, sprinkler, and lighting to work with new ceilings. Install drywall partition.Permit number: 16 120…
REV 01: Office quality of life improvements. Install t-bar ceilings with adjustments made to HVAC, sprinkler, and lighting to work with new ceilings. Install drywall partition.Permit number: 16 120…
HVAC - construct pre-fabricated building for "Bell Canada" switches
construct pre-fabricated building for "Bell Canada" switches
Provide edge installation for bollard barriers
Provide edge installation for bollard barriers
Proposed Alternative Solution to the sprinkler systems. See attached document. Flushing vs Swabbing of underground Fire Service Mains.
Retaining wall 6 between CP Rail and Mt. Dennis Station - Eglinton Crosstown LRT
This alternative solution pertains to the installation of a clean agent fire suppression system in lieu of sprinklers, in the Fluid Storage Room 141 located in the Maintenance Building which forms …
HVAC - TPSS Building for the Eglinton Crosstown LRT - Eglinton - YARD TPSS (EMSF site)
HVAC - TPSS Building for the Eglinton Crosstown LRT - Eglinton - YARD TPSS (EMSF site)
Conditional Permit - Construction of the operations building for the Eglinton Crosstown LRT - OPSCO BUILDING (Operations and Staff building)
Conditional Permit - EMSF building - Construct the maintenance and storage facility for the Eglinton Crosstown LRT
HVAC - Construction of the operations building for the Eglinton Crosstown LRT - OPSCO BUILDING (Operations and Staff building)
HVAC - Construct the maintenance and storage facility for the Eglinton Crosstown LRT
Drain - Construction of the operations building for the Eglinton Crosstown LRT - OPSCO BUILDING (Operations and Staff building)
Inside underground drain only. - Construct the maintenance and storage facility for the Eglinton Crosstown LRT
Propoased layout of repair and maintenance portion of EMSF building based on the operational requirements to the intended use of the space. The second floor of EMSF building will have offices and s…
Requirments for the EMSF Building are governed by OBC article 3.2.2.67, The heavy and light maintenance area in the EMSF Building will have three elevated work platforms, are required for access to…