355 CHURCH ST
REVISION-01Plumbing - Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION-01Plumbing - Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
Proposal to install a maglock in existing office space.
FS - Sprinkler Shop Drawing - Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
Plumbing - Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
HVAC - Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
Revision Increase Unit Posted occupant Load to 38 persons (from 10 persons) given availability of additional 2nd floor washrooms
HVAC - Proposal to construct interior alterations to an existing office space.
Proposal to construct interior alterations to an existing office space.
Plumbing - Alterations to P3 and P4 underground levels to add two lockers. Includes provision of additional mechanical and electrical to accomodate the lockers.
HVAC - Alterations to P3 and P4 underground levels to add two lockers. Includes provision of additional mechanical and electrical to accomodate the lockers.
Alterations to P3 and P4 underground levels to add two lockers. Includes provision of additional mechanical and electrical to accomodate the lockers.
In conjunction with a multiple storey building in this property an application has been made for an illuminated wall sign and a non-illuminated wall sign to display static copy at the first storey …
modify kitchen exhaust ductwork for existing take out restaurant (A & W) unit 125
REV 01 - Proposed revision due to site conditions for the washroom fixture locations; mop sink and hot water tank locations as well as HVAC, and an additional hand sink in the kitchen area.HVAC - P…
REV 01 - Proposed revision due to site conditions for the washroom fixture locations; mop sink and hot water tank locations as well as HVAC, and an additional hand sink in the kitchen area.Proposal…
REV 01 - Proposed revision due to site conditions for the washroom fixture locations; mop sink and hot water tank locations as well as HVAC, and an additional hand sink in the kitchen area.Plumbing…
Revision 04: Proposal to remove one barrier free washroom located on the 5th level.Building Permit Revision-sprinkler drawings to match changes to architectural drawings. Related Building Permit # …
Building Permit Revision-sprinkler drawings to match changes to architectural drawings. Related Building Permit # 14 257790 BLDREVISION # 02 - architectural, mechanical, electrical. Refer to revisi…
Updated Nov 20, 2026