Proposed Alternative Solution to address the fire shutter within the exit lobby fire separation within the ground floor of 357 Bay St
REV 02 - CONSTRUCTION OF NEW PARTITIONS & FINISHES, INSTALLATION OF A NEW GF UNIVERSAL WASHROOM, & CREATION OF NEW INTERNAL OPENING AT GF LOBBY, REFER TO ALTERNATE SOLUTION. NO CHANGES TO THE EXIST…
Rev 01 - Change of use at ground floor previously approved under existing permit. Reinstatement of original floor openings at mezzanine previously approved under existing permitHVAC - PROPOSED: Flo…
Rev 01 - Change of use at ground floor previously approved under existing permit. Reinstatement of original floor openings at mezzanine previously approved under existing permitPlumbing - PROPOSED:…
Rev 02 -Proposed revised interior layouts (tenant fit-out) for floors 3-10. Single tenant (WeWork) for entire building, floors 1 thru 10. See attached cover letter for detailsREV 01: PHASE 1 SEE CO…
Rev 02 -Proposed revised interior layouts (tenant fit-out) for floors 3-10. Single tenant (WeWork) for entire building, floors 1 thru 10. See attached cover letter for detailsREV 01: PHASE 1 SEE CO…
Rev 02 -Proposed revised interior layouts (tenant fit-out) for floors 3-10. Single tenant (WeWork) for entire building, floors 1 thru 10. See attached cover letter for detailsPHASE 1REV 01:SEE COVE…
REVISION#1: REDUCE FIRE SHUTTER SIZE AT MEZZANINE LEVEL AS PER OPTION 1 OF APPLICATION #20 171409 ALT 00 AS. PROPOSAL FOR INTERIOR RENOVATIONS (TENANT FIT-OUT) TO FLOORS 1 (GROUND), 2 AND 2M (MEZZA…
PHASE 1REV 01:SEE COVER LETTERPlumbing - PROPOSED: INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT…
REV 01: PHASE 1 SEE COVER LETTERPROPOSED: [Floors 3 -10, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW …
REV 01: PHASE 1 SEE COVER LETTERHVAC - PROPOSED: INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, …
Proposed Alternative Solution to address the use of oversized rolling steel fire doors (i.e fire shutters) separating the level 2 and level 2 mezzanine openings at 357 Bay St. Related to permit # 2…
AS-GROUND FLOOR EXIT DOOR FOR MAG LOCKInstall two maglock to existing office building
PROPOSAL FOR INTERIOR RENOVATIONS (TENANT FIT-OUT) TO FLOORS 1 (GROUND), 2 AND 2M (MEZZANINE). SCOPE OF WORK INCLUDES CONSTRUCTION OF NEW PARTITIONS AND FINISHES, INSTALLATION OF MECHANICAL AND ELE…
HVAC - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF NEW …
Plumbing - PROPOSED: Floors 1-2, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, INSTALLATION OF MECHANICAL AND ELECTRICAL DISTRIBUTION, INSTALLATION OF …
Plumbing - PROPOSED: INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL A…
HVAC - PROPOSED: INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICAL AND E…
PROPOSED: Floors 3 -10, INTERIOR RENOVATION (TENANT FIT-OUT) INCLUDING CONSTRUCTION OF NEW PARTITIONS AND FINISHED, RELOCATION OF FAN COIL UNITS TO SUIT TENANT NEW LAYOUT, INSTALLATION OF MECHANICA…