Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 1 - See list on the cover letter.Voluntary installation of sprinkler, fire alarm and geothermal infrastructure to facilitate future upgrades.Commissioning of existing unconnected sprinkler…
HVAC - Voluntary installation of sprinkler, fire alarm and geothermal infrastructure to facilitate future upgrades.Commissioning of existing unconnected sprinkler systems on select areas on levels …
FS - Sprinkler Shop Drawing - Voluntary installation of sprinkler, fire alarm and geothermal infrastructure to facilitate future upgrades.Commissioning of existing unconnected sprinkler systems on …
Plumbing - Voluntary installation of sprinkler, fire alarm and geothermal infrastructure to facilitate future upgrades.Commissioning of existing unconnected sprinkler systems on select areas on lev…
Voluntary installation of sprinkler, fire alarm and geothermal infrastructure to facilitate future upgrades.Commissioning of existing unconnected sprinkler systems on select areas on levels 1 & 3.
Replacing existing 416V MCCs with new 600V MCCs and change the MCC loads like to like without disturbing the existing system
add 3 maglocks and smoke detection to east vestibulLE (REFER TO 21 137460 ALT 00 AS)
Proposal to install a maglock to door, 1-91A.
REV - 04: Permit Revision to reduce posted occupant load as noted (Maglock requires Separate FSU Permit)remove the sprinkler riser and 6th floor sprinklers, capping the riser and installing smoke d…
Rev 2: Additional Maglock as bubbled on the Basement 2 plansREVISE PERMIT TO ADD AN ADDITIONAL 2 MAGLOCKS ON 4TH AND 5TH FLOORS AS SHOWN ON THE NEW DRAWINGSTOTAL MAGLOCKS 111To install 118 Electrom…
REV - 03: Permit Revision REMOVE Sprinkler on floors: Ground 2, 4, 5, 6 remove the sprinkler riser and 6th floor sprinklers, capping the riser and installing smoke detectors on the 6th floor. Minor…
Revision 01- To add an additional 2 maglocks on 4th and 5th floors as shown on the new drawings total maglocks 111.To install 118 Electromagnetic Locks to an existing Courthouse. Installation to co…
REV02: remove the sprinkler riser and 6th floor sprinklers, capping the riser and installing smoke detectors on the 6th floor. Minor layout changesProposal for interior office renovation - floors g…
Revision #01 - Changes to increase jury selection assembly and waiting area. (381 Jury + 9 Staff)Proposal for interior office renovation - floors ground, 2, 3, 4, 5, 6, 7 such as: new Family Courtr…
Proposal for interior alterations to add structural reinforcement for high density file storage on ground level of the exsiting office building.
Revision to remove the visual fire alarm.
Proposal for interior office renovation - floors ground, 2, 3, 4, 5, 6, 7 such as: new Family Courtrooms, Jury Assembly, Motions room & related offices, keeping the main public corridors with herit…
Revision to install 3 back flow preventers on the mains to the building and expansion tank on the incoming domestic water line to the building. - INSTALLATION OF BACK FLOW PREVENTER AND EXPANSION T…
FS - Sprinkler Shop Drawing - Proposal for interior renovation - early works. Basement and level 3 in the existing courthouse.
Page numbers are hidden until the total count is available from the data service.