375 EASTERN AVE
Proposed installation of 30'x40' Tent. Install is Sept 26th and removal is Sept 26th. Tent will be staked to ground
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed installation of 30'x40' Tent. Install is Sept 26th and removal is Sept 26th. Tent will be staked to ground
REV 01 - Revision to drain permitDrain - Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor
Proposal for alternative solution related to fire protection and life safety, as they relate to East Harbour Transit Hub (Project), located in Toronto, ON
Drain - Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor
Drain - Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor
Alternative Solution: applicable building code requirements, relative to fire protection and life safety, as they relate to East Harbour Transit Hub (Project), located in Toronto, ON.Part 5
Alternative Solution: applicable building code requirements, relative to fire protection and life safety, as they relate to East Harbour Transit Hub (Project), located in Toronto, ON.Travel Distanc…
Alternative Solution: applicable building code requirements, relative to fire protection and life safety, as they relate to East Harbour Transit Hub (Project), located in Toronto, ON. Part 2
Alternative Solution: applicable building code requirements, relative to fire protection and life safety, as they relate to East Harbour Transit Hub (Project), located in Toronto, ON.Part 3
Alternative Solution: applicable building code requirements, relative to fire protection and life safety, as they relate to East Harbour Transit Hub (Project), located in Toronto, ON.Part 6
Alternative Solution: applicable building code requirements, relative to fire protection and life safety, as they relate to East Harbour Transit Hub (Project), located in Toronto, ON.Part 4Alternat…
Proposal for Installation of one 30 x 40 frame tent for staff event. Installation date May 7th and removal May 9th
Conditional Permit - Part Permit - Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor
Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor
Plumbing - Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor
HVAC - Proposal for New construction of East Harbour Transit Hub station at Lakeshore East rail corridor
Installation of one 30 x 40 frame tent (certified 14-219367) for staff BBQ. Installation date Oct 9 and removal October 11th
Installation of one 30' x 40" frame tent (Cert#14 219367) anchored with stakes, for a staff BBQ on May 9 2024. Installation: May 8 2024 Removal: May 10 2024
Proposal of construction of the East Harbour Transit Hub SmartTrack Station, an integrated GO and Ontario Line interchange station. Subject lands include the Metrolinx rail corridor between the Don…
Installation of one 30' x 40" frame tent (Cert#14 219367) anchored with stakes into ground for a staff BBQ on Friday September 15 2023. Installation to begin on sep 13 2023 and tent will be removed…