Drain - TRANSFORMING EXISTING STAFF MEETING ROOM AT GROUND FLOOR TO A 1-BEDROOM RESIDENTIAL UNIT.ALTERATION TO PLUMBING, HVAC & DRAIN IN SELECT AREA. NO STRUCTURAL ALTERTAIONS
TRANSFORMING EXISTING STAFF MEETING ROOM AT GROUND FLOOR TO A 1-BEDROOM RESIDENTIAL UNIT.ALTERATION TO PLUMBING, HVAC & DRAIN IN SELECT AREA. NO STRUCTURAL ALTERTAIONS
Plumbing - TRANSFORMING EXISTING STAFF MEETING ROOM AT GROUND FLOOR TO A 1-BEDROOM RESIDENTIAL UNIT.ALTERATION TO PLUMBING, HVAC & DRAIN IN SELECT AREA. NO STRUCTURAL ALTERTAIONS
HVAC - TRANSFORMING EXISTING STAFF MEETING ROOM AT GROUND FLOOR TO A 1-BEDROOM RESIDENTIAL UNIT.ALTERATION TO PLUMBING, HVAC & DRAIN IN SELECT AREA. NO STRUCTURAL ALTERTAIONS
Revision 01- Change the existing single stage alarm system for complex to modified single stage alarm system per approved AS 20 206726 ALT 00; changes include modifications to fire alarm system and…
Revision #1 Additional plumbing work for existing drain system in the Garbage Storage (101.1) and diversion room (1012) Revision of the routing for the connection to the existing plumbing system in…
Revision #2 - addition of fire dampers in existing ventilation ducts crossing the corridor @2 and new location of a transfer duct serving the mailroomRevision 01. Modification to the HVAC system. A…
Revision 01- See alternative solution 20 206726 ALT 00 AS. PERMIT RESUBMISSION TO UPDATE CODE REPORT AND RELATED DRAWINGS TO REFLECT AS-BUILT CONDITIONS, NOTING THE FOLLOWING CHANGES:-TOWER/AMENITY…
REV02: Addition to the SPRINKLERS WORK: addition in the scope of work in the basement 1. A corridor has been added to the scope of work.REV01: Modification to the sprinkler work: change in the scop…
REV01: Modification to the sprinkler work: change in the scope of work in the basement 2 because of an existing corridor that has been removed by others. Revisions on the ground floor rooms 101.1, …
Revision 01. Modification to the HVAC system. Addition of a make up air transfer duct in the diversion room (101.2)
Plumbing - Proposal for interior alterations to the ground floor amenity space, garbage / recycling rooms, lobby and corridors on all floors.
HVAC - Proposal for interior alterations to the ground floor amenity space, garbage / recycling rooms, lobby and corridors on all floors.
Proposal for interior alterations to the ground floor amenity space, garbage / recycling rooms, lobby and corridors on all floors.
Proposal to replace domestic hot & cold water riser piping and including domestic hot water recirculation piping within apartment building.
Proposal for cladding repairs to existing apartment building.
Conditional Permit - Part Permit - Amenity Building D to #40 and #50 HIGH PARK and #55 and 77 Quebec Avenue
HVAC - Amenity Building D to #40 and #50 HIGH PARK and #55 and 77 Quebec Avenue
Plumbing Amenity Building D to #40 and #50 HIGH PARK and #55 and 77 Quebec Avenue