400 FENMAR DR
Proposal to upgrade the existing fire protection system to meet the requirements for the manufacturing of plastic goods
Showing first 12 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to upgrade the existing fire protection system to meet the requirements for the manufacturing of plastic goods
Provide a structural support for cogeneration piping utiliites, attaching to existing building columns
Revision 01: Revised structural drawingsProposal to construct a concrete pad to support electrical conduits
Proposal to construct a concrete pad to support electrical conduits
replace fire alarm panel and add sprinklers to duct, silo and mezzanine
Framing for air makeup unit and new duct to roof.
HVAC - Framing for air makeup unit and new duct to roof.
Revision #1: Changes made to make up air and direction of ductwork.HVAC - Proposed duct collector to be installed at existing industrial manufacturing plant.
Proposed installation of exhaust hood system above press machinery in existing instustrial plant.
FS - Sprinkler Shop Drawing - Proposed foundations for two indoor storage silos and for exterior dust collector.
HVAC - Proposed duct collector to be installed at existing industrial manufacturing plant.
Proposed foundations for two indoor storage silos and for exterior dust collector.
End of list for these filters.