400 GREENWOOD AVE
Proposal for structural rehabilitation of the Hostler Platform at Greenwood Yard. Note that a hostler platform is a platform that is used only by internal TTC forces to access subway trains.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for structural rehabilitation of the Hostler Platform at Greenwood Yard. Note that a hostler platform is a platform that is used only by internal TTC forces to access subway trains.
Proposal for interior alterations (replacement of pump pit access hatch, localized concrete repairs, alterations and installation of pit ladders and pump control rework).
Part Permit - This request for Partial Permit is limited to the following scope of work: 1) Reinforced concrete slab floor supported by micropiles; 2) Deep micropile foundation to support the build…
Drain - This request for Partial Permit is limited to the following scope of work: 1) Reinforced concrete slab floor supported by micropiles; 2) Deep micropile foundation to support the building fl…
HVAC - Proposal for replacement of passenger elevator within the Carhouse building at Greenwood Yard including the addition of a cooling system and associated works (BLD, HVA and PLB)
Proposal for replacement of passenger elevator within the Carhouse building at Greenwood Yard including the addition of a cooling system and associated works (BLD, HVA and PLB)
Plumbing - Proposal for replacement of passenger elevator within the Carhouse building at Greenwood Yard including the addition of a cooling system and associated works (BLD, HVA and PLB)
Proposed replacement of the existing 3T bridge crane with a new 10T bridge crane addition within the TTC train maintenance facility, and all associated mechanical work.
HVAC - Proposed replacement of the existing 3T bridge crane with a new 10T bridge crane addition within the TTC train maintenance facility, and all associated mechanical work.
REV 01: The Changes reflect modifications to the natural gas-consuming Make-up Air Units (MUAs) supplying heated ventilation to the Greenwood Shop Paint & Sanding Booth. The units have been altered…
REV 01: The Changes reflect modifications to the natural gas-consuming Make-up Air Units (MUAs) supplying heated ventilation to the Greenwood Shop Paint & Sanding Booth. The units have been altered…
Plumbing - Proposed elevator overhaul at TTC's Greenwood Yard facility.
Proposed elevator overhaul at TTC's Greenwood Yard facility.
HVAC - Proposed pre-fabricated building to house power supply and signal equipment rooms for both TTC Greenwood and Line 2 ATC. Ref: Zoning Applicable Law Certificate: 24 219716 ZAP 00 ZR.
Proposed pre-fabricated building to house power supply and signal equipment rooms for both TTC Greenwood and Line 2 ATC. Ref: Zoning Applicable Law Certificate: 24 219716 ZAP 00 ZR.
Remove and replace rails and supporting structural steel frames along Tracks 29 and 30 North.
Modification to TTC Greenwood Shop paint and sanding booths, this includes:1. Upgrade/replacement of the Paint and Sanding booth equipment and associated system.2. Installation of new exhaust syste…
Plumbing - Modification to TTC Greenwood Shop paint and sanding booths, this includes:1. Upgrade/replacement of the Paint and Sanding booth equipment and associated system.2. Installation of new ex…
HVAC - Modification to TTC Greenwood Shop paint and sanding booths, this includes:1. Upgrade/replacement of the Paint and Sanding booth equipment and associated system.2. Installation of new exhaus…
Revision 02 - 1-Previously building classification was submitted as F2. The proposed building is a Valve House, unoccupied space that is built to provide closed room for valves. There is not going …