Showing first 14 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Plumbing - TENANT FIT UPNEW CLOTHES WASHING/DRY CLEANING FACILITY
TENANT FIT UPNEW CLOTHES WASHING/DRY CLEANING FACILITY
HVAC - Proposal for interior alterations to convert existing storage building into mixed use building with multiple units
Proposal for interior alterations to convert existing storage building into mixed use building with multiple units
Proposal for obtaining occupancy permit for existing laundry (F1) in an existing mixed use building. Former occupancy was a storage. Fire rate of walls and door are subject to change to suit the re…
HVAC - Proposal for obtaining occupancy permit for existing laundry (F1) in an existing mixed use building. Former occupancy was a storage. Fire rate of walls and door are subject to change to suit…
Plumbing - Proposal for obtaining occupancy permit for existing laundry (F1) in an existing mixed use building. Former occupancy was a storage. Fire rate of walls and door are subject to change to …
Installation of the Fire Panel System
Proposed new canopy (9 meter long, 1.5m wide) at north side of existing building
Interior alterations to the first floor to become office and meeting room
Construct interior alterations for a practice classroom for PLC and Electric technician - ground floor and classroom on second floorchange of use - permit
Proposal for interior alterations to existing office space-unit 200.
Plumbing - Proposal for interior alterations to existing office space-unit 200.
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.