411 CLENDENAN AVE
REVISION 2 - alterations to the fire separationsPROPOSED: interior alteration to an existing daycare building to become the Clover school Montessori, scope includes demolishing and constructing int…
Showing first 12 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 2 - alterations to the fire separationsPROPOSED: interior alteration to an existing daycare building to become the Clover school Montessori, scope includes demolishing and constructing int…
REVISION 2 - alterations to the fire separations
Drain - Site services water main replacement. PROPOSED: interior alteration to an existing daycare building to become the Clover school Montessori, scope includes demolishing and constructing inter…
Revision 02: Reduced toilets and sinks to meet existing site conditions.
The existing service water pipe is not enough to support all of designed fixtures. we provide alternative solution, which is provide new water stoage tanks and pump in basement, to have sufficient …
Revision 01: update the occupancy and plumbing fixture calculation.
Revision 01: The existing service water is not sufficient, reduced some toilet and sink to meet site existing condition
FS - Sprinkler Shop Drawing - PROPOSED: interior alteration to an existing daycare building to become the Clover school Montessori, scope includes demolishing and constructing interior partition wa…
Plumbing - PROPOSED: interior alteration to an existing daycare building to become the Clover school Montessori, scope includes demolishing and constructing interior partition walls, constructing a…
HVAC - PROPOSED: interior alteration to an existing daycare building to become the Clover school Montessori, scope includes demolishing and constructing interior partition walls, constructing a new…
PROPOSED: interior alteration to an existing daycare building to become the Clover school Montessori, scope includes demolishing and constructing interior partition walls, constructing a new floor …
Proposal to install a backflow prevention device
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.