411 DUPLEX AVE
Proposed installation of new outdoor condensate drainage risers for the newly installed heat pump units installed under 26 122118 MSA 00 MS.
Showing first 17 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposed installation of new outdoor condensate drainage risers for the newly installed heat pump units installed under 26 122118 MSA 00 MS.
26 237030 PLB 00 PS needs to be issued for: ¿Proposed installation of new outdoor condensate drainage risers for the newly installed heat pump units installed under 26 122118 MSA 00 MS.¿
Proposal to Installation of a new Split Unit System for all the Suites in the Building to replace the in-floor radiant heating.26 237030 PLB 00 PS needs to be issued for: ¿Proposed installation of …
Convert the vacant space in Unit 0110 for a personal service shop - Uplift Nail Studio
Plumbing - Convert the vacant space in Unit 0110 for a personal service shop - Uplift Nail Studio
HVAC - Convert the vacant space in Unit 0110 for a personal service shop - Uplift Nail Studio
Proposal to supply and install a temporary work platform on the exterior of the building
Proposal to maintain accessibility for handicap and disable people (residents) by considering a lift installation to facilitate the route to Laundry Room through existing stairs. No zoning review r…
Localized Concrete Repairs Within the Transformer Room. The scope includes concrete repairs to the roof slab of the transformer room and at the walls within the vicinity of the transformer room.Wor…
Plumbing - Proposal to convert live/work studio into 3 residential suites on the 22nd floor
HVAC - Proposal to convert live/work studio into 3 residential suites on the 22nd floor
Proposal to convert live/work studios into 3 residential suites on the 22nd floor
Proposed installation of a new door
Proposal to install 1 premise isolation backflow preventor in existing apartment
Addition of steps and retaining wall adjacent to the existing apartment building (northwest corner)
Concrete repairs to 546 balconies and balcony guard replacements
Repairs to rooftop pool enclosure windows
End of list for these filters.