425 CHERRY ST
REVISION - adding maglocksProposed maglocks on the following doors:P-029, R0303, R0502, R0702, L01 on East and West side of pool. In the TEEC building they are located on the following doors;D201,D…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION - adding maglocksProposed maglocks on the following doors:P-029, R0303, R0502, R0702, L01 on East and West side of pool. In the TEEC building they are located on the following doors;D201,D…
1 Wall Sign1 Ground Sign
Revision 01 - Revision to include installation of five maglocks - additional doors to existing permit 24-142169 FSU 00 FS------------------------------------------------------------------Proposal t…
1 Wall Sign1 Ground Sign
REV 02 - Revision to new community health centreREV 01: -relocated incoming water from Mechanical Room to Community Room 155-revised head locations to avoid interferences with occupancy sensors and…
Proposal to install 2 maglocks
Rev 01 - Revision for changes made to the layout of the 3 offices, a kitchen and washroom on the 2nd floor. Plumbing - Proposal to construct a 10 storey addition over existing 3 storey heritage bui…
Rev 01 - Revision for changes made to the layout of the 3 offices, a kitchen and washroom on the 2nd floor. HVAC - Proposal to construct a 10 storey addition over existing 3 storey heritage buildin…
Rev 01 - Revision for changes made to the layout of the 3 offices, a kitchen and washroom on the 2nd floor. Proposal to construct a 10 storey addition over existing 3 storey heritage building consi…
Proposed maglocks on the following doors:P-029, R0303, R0502, R0702, L01 on East and West side of pool. In the TEEC building they are located on the following doors;D201,D301, DD3SG, D4SG, D401, D4…
REV 01: -relocated incoming water from Mechanical Room to Community Room 155-revised head locations to avoid interferences with occupancy sensors and lights, showed flow switches and valves, update…
Alternative Solution 1 - Proposed to apply the design, installation, and testing provisions of the 2016 edition of NFPA 13 for the proposed building over the current 2013 edition of NFPA 13 adopted…
Alternative Solution 2 - Proposed to provide 65 mm standpipe hose valve connections on the main landings, or intermediate landings where it is not possible due to stair design, next to exit doors f…
Conditional Permit - Part Permit - Proposal to construct a 10 storey addition over existing 3 storey heritage building consisting of 443 dwelling units, construct a 5 storey office building and int…
Alternative solution for the firewall, related building permit 19 263742
Conditional Permit - Part Permit - Proposal to construct a 10 storey addition over existing 3 storey heritage building consisting of 443 dwelling units, construct a 5 storey office building and int…
Deferred Fees from folder20 205622 BLD 00 NB(RSN-4982907)
Proposal to install 3 maglocks in P1 Parking
FS - Sprinkler Shop Drawing - Proposal to construct a 10 storey addition over existing 3 storey heritage building consisting of 448 dwelling units, construct a 5 storey office building and interior…
FS - Sprinkler Shop Drawing - Block 10, Phase A - Proposal to construct a new 4 storey medical office building - Anishnawbe Health Toronto Health Centre, Indigenous Hub project. See also 19 215798 …
Page numbers are hidden until the total count is available from the data service.