Showing first 14 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION TO HVAC SYSTEM
1 PROJECTING SIGN & 1 WALL SIGN***NONNI CAFE***
REVISION 1: Revision to kitchen exhaust system.HVAC - Proposal to construct interior alterations for bakery cafe - Unit 4
HVAC - Proposal to construct interior alterations for bakery cafe - Unit 4
HVAC - Proposal for interior alterations to ground floor restaurant with 35 seats in existing mixed-use building (207.1m2). Includes kitchen exhaust.
Proposal for interior alterations to ground floor restaurant with 35 seats in existing mixed-use building (207.1m2). Includes kitchen exhaust.
HVAC - Proposal for interior alterations to exisitng mixed use building retail unit suite 116 "Noah's Natural Food" (188.98m2).
Proposal to install 1 mag lock on P1 level. Note: see active BLD permit for new Condo 07 288762.
Sprinklers in connection with BLD 07 288762.
HVAC - New 32-storey mixed-use building. Now proposed to 36 storey ( as per revised submission of drawings on Sep 23, 2008 )
Plumbing - New 32-storey mixed-use building. Now proposed to 36 storey ( as per revised submission of drawings on Sep 23, 2008 )
New 36-storey mixed-use building. Retail at GF and above residential Condo(314 units) with six level below grade parking.
PLANNING - SITE PLAN APPROVAL - Proposed 30 storey condominium building with 306 residential unita; 5 levels of underground parking; commercial at grade. Please see previously filed rezoning applic…
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.