Showing first 6 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
PROPOSED: TEMPORARY STRUCTURE (ON PRIVATE PROPERTY): PROVIDE TEMPORARY EXIT/ENTRY FIRE-RATED DOOR WITH NON-COMBUSTIBLE ALUMINIUM STAIRS, PLATFORM, HANDRAILS & GUARDRAILS DURING CONSTRUCTION. TEMPOR…
PROPOSED:TEMPORARY STRUCTURE (ON PRIVATE PROPERTY):PROVIDE TEMPORARY EXIT/ENTRY FIRE-RATED DOOR WITH NON-COMBUSTIBLE ALUMINIUM STAIRS, PLATFORM, HANDRAILS & GUARDRAILS DURING CONSTRUCTION.TEMPORARY…
PROPOSED: THE PROJECT IS TO INSTALL A NEW LULA LIFT FOR BARRIER FREE ACCESS FROM THE FRONT DOOR AT STREET LEVEL TO THE BASEMENT (1/2 STOREY BELOW GRADE) + EXISTING STAIRS FROM THE FRONT DOOR TO THE…
HVAC - PROPOSED: THE PROJECT IS TO INSTALL A NEW LULA LIFT FOR BARRIER FREE ACCESS FROM THE FRONT DOOR AT STREET LEVEL TO THE BASEMENT (1/2 STOREY BELOW GRADE) + EXISTING STAIRS FROM THE FRONT DOOR…
Plumbing - PROPOSED: THE PROJECT IS TO INSTALL A NEW LULA LIFT FOR BARRIER FREE ACCESS FROM THE FRONT DOOR AT STREET LEVEL TO THE BASEMENT (1/2 STOREY BELOW GRADE) + EXISTING STAIRS FROM THE FRONT …
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.