Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01 - Proposed window at the west wall of the covered link between existing temple and existing cultural centre to be replaced with a barrier-free door.-------------------------------------…
Proposal to construct a new 1 storey addition (covered link) between the existing place of worship and the cultural centre.
The proposal contains two illuminated wall signs, both displaying static copy, erected at the first storey on the north elevation.Dimensions:Sign 1: 0.41m L x 5.13m W x 0.1m D at a height of 3.86m.…
2 - 40 x 120 temporary tents, certified 14 -206102 in the parking lot of place of worship
Rev 02: New siamese connection
Revison 01-underground link for sprinkler and main water line pipes from existing to proposed building Plumbing - Proposed construction of a new Place of Worship - "Jain Temple" (Phase II).
Rev 01: new accessible ramp located on south elevation of building
Revision 01: changes to the site services as per bubbled drawings
FS - Sprinkler Shop Drawing - Proposed construction of a new Place of Worship - "Jain Temple" (Phase II).
In conjunction with a three-storey building on the premises, proposal to erect and display two illuminated wall signs, displaying static copy at the 1st floor on the south and west elevations. ****…
Proposed construction of a new Place of Worship - "Jain Temple" (Phase II).
HVAC - Proposed construction of a new Place of Worship - "Jain Temple" (Phase II).
Plumbing - Proposed construction of a new Place of Worship - "Jain Temple" (Phase II).
Drain - Proposed construction of a new Place of Worship - "Jain Temple" (Phase II).
REV #4- ALTER DUCT ROUTES & SIZES, FIRE DAMPERS, ELIMINATE vvt, REVISE LAYOUTSHVAC - new cultural centre with restaurant, auditorium/gymnasium, library and related offices - New Building
Proposal to erect and display one illuminated wall sign displaying static copy on the first storey of the southerly elevation, measuring 10.35 m by 1.34 m at a height of 4.74 m. ***MOTI CHAMPSEE CU…
REV 02 - Revision to layoutRev#1 - Revision to layout for Jain Temple & Cultural Centre, temple & community centrePlumbing - new greek cultural centre with restaurant, auditorium/gymnasium, library…
Drain - Jain Temple & Cultural Centre, Temple & Community Centre as per application submitted December 29, 2014.Original application for a greek cultural centre with restaurant, auditorium/gymnasiu…
REV 03 - Minor revision of ductworks and locations of rooftop HVAC units.Revision 02 - ductworks and locations of rooftop HVAC unitsRev#1 - Revision to layout for Jain Temple & Cultural Centre, tem…
Page numbers are hidden until the total count is available from the data service.