4590 DUFFERIN ST
Revision 01 - proposal revision on the main floorHVAC - The project is part conversion of 892.10sqm of offfice space to self-storage lockers at the north-east conrner of the main floor level.
Showing first 14 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Revision 01 - proposal revision on the main floorHVAC - The project is part conversion of 892.10sqm of offfice space to self-storage lockers at the north-east conrner of the main floor level.
Revision 01 - proposal revision on the main floorThe project is conversion of an existing self storage industrial building of 892.10sqm of offfice space to self-storage lockers at the north-east co…
FS - Sprinkler Shop Drawing - Fit-out of lower level with self storage lockers and rental office
Fit-out of lower level with self storage lockers and rental office
HVAC - Fit-out of lower level with self storage lockers and rental office
Plumbing - Fit-out of lower level with self storage lockers and rental office
HVAC - The project is part conversion of 892.10sqm of offfice space to self-storage lockers at the north-east conrner of the main floor level.
The project is conversion of an existing self storage industrial building of 892.10sqm of offfice space to self-storage lockers at the north-east conrner of the main floor level.
FS - Sprinkler Shop Drawing - Proposed project is part conversion of 570.90sq m, of office space to self-storage lokers at the south-east corner of the main floor level.
To erect and display one illuminated double-sided 3rd party ground sign displaying mechanical copy, measuring 6.1 meters horizontally by 3.05 meters vertically at the height of 10 meters adjacent t…
HVAC - Proposed project is part conversion of 570.90sq m, of office space to self-storage lokers at the south-east corner of the main floor level.
Proposed project is part conversion of 570.90sq m, of office space to self-storage lokers at the south-east corner of the main floor level.
An addition to the existing self storage building (finished).
HVAC - An addition to the existing self storage building (finished).
End of list for these filters.
Page numbers are hidden until the total count is available from the data service.