748 BROCK AVE
Proposal to construct detached garage in the rear yard of the existing 2 unit dwelling.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to construct detached garage in the rear yard of the existing 2 unit dwelling.
Proposal to construct detached garage in the rear yard of the existing 2 unit dwelling.
Proposal to construct a detached garage and reconfigure the existing deck by reducing its current area and adding a new section.
HVAC - Proposal for a new 3rd floor addition and interior alterations on the 2nd floor of an existing 2 storey townhouse. See also 18 267527 ZZC, 19 118162 MV and Final and BInding A0189/19TEY.
HVAC - Proposal for interior alterations to the existing single family dwelling.
Plumbing - Proposal for interior alterations to the existing single family dwelling.
PROPOSED NEW DETACHED GARAGE W/ ALUM/.SIDING
Proposal for interior alterations to the existing single family dwelling.
proposing new front porch enclosure
REV 01 - Changes as per bubbled drawings. Proposal for interior alterations and a rear addition
Party wall admin permit related to permit # 20 127060 BLD 00 SR for address # 750 Brock Ave
Plumbing - Proposal for a new 3rd floor addition and interior alterations on the 2nd floor of an existing 2 storey townhouse with 2 units. See also 18 267527 ZZC, 19 118162 MV and Final and BInding…
Proposal for a new 3rd floor addition and interior alterations on the 2nd floor of an existing 2 storey townhouse. See also 18 267527 ZZC, 19 118162 MV and Final and BInding A0189/19TEY.
HVAC - To rebuild rear addition, interior alterations, create 2nd unit on second floor, underpin basement and rebuild existing deck
Proposed interior alterations to replace an interior stair with new in an existing single family semi-detached dwelling.
To rebuild rear addition, interior alterations, create 2nd unit on second floor, underpin basement and rebuild existing deck
Plumbing - To rebuild rear addition, interior alterations, create 2nd unit on second floor, underpin basement and rebuild existing deck
Proposed underpinning of the basement foundation of an existing single family townhouse dwelling.
HVAC - Proposal for interior alterations and a rear addition
Drain - Proposal for interior alterations and a rear addition
Page numbers are hidden until the total count is available from the data service.