Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REVISION 01: Proposed Mezzanie changes to include the utilities room are moved to mezzazine floor, washrooms have been relocated to first floor.Construct new mezzanine (2nd floor), interior alterat…
REVISION 01: Proposed Mezzanie changes to include the utilities room are moved to mezzazine floor, washrooms have been relocated to first floor.Plumbing - Construct new mezzanine (2nd floor), inter…
REVISION 01: Proposed Mezzanie changes to include the utilities room are moved to mezzazine floor, washrooms have been relocated to first floor.HVAC - Construct new mezzanine (2nd floor), interior …
HVAC - Proposal for legalization and extension of existing mezzanine to become a second story accessed by way of code-compliant stairs
Revision Plumbing 01 - Revision Permit on Plumbing System(Original Permit Number 24124992 PLB 00 PS)--------------------------------------------------------------------Plumbing - Proposed Interior …
Proposal for legalization and extension of existing mezzanine to become a second story accessed by way of code-compliant stairs
HVAC - Proposed Interior Alterations Proposed Commercial Kitchen Ventilation and Plumbing Systems to convert existing office space into a restaurant.
Plumbing - Proposed Interior Alterations Proposed Commercial Kitchen Ventilation and Plumbing Systems to convert existing office space into a restaurant.
Proposed Interior Alterations Proposed Commercial Kitchen Ventilation and Plumbing Systems to convert existing office space into a take out restaurant.
Plumbing - Construct new mezzanine (2nd floor), interior alterations for new universal washroom
HVAC - Construct new mezzanine (2nd floor), interior alterations for new universal washroom
Construct new mezzanine (2nd floor), interior alterations for new universal washroom. Change of use from commercial to holistic centre (spa/fitness).
Plumbing - PROPOSED: INTERIOR WORK ONLY - HOLISTIC SERVICES CENTERNew Addition Storage Mezzanine (45.54 SM). New Universal washroom
PROPOSED: INTERIOR WORK ONLY - HOLISTIC SERVICES CENTER unit #37Construct Storage Mezzanine / second floor (45.54 SM). New Universal washroom
HVAC - PROPOSED: INTERIOR WORK ONLY - HOLISTIC SERVICES CENTERNew Addition Storage Mezzanine (45.54 SM). New Universal washroom
install backflow preventer on fire line
FS - Sprinkler Shop Drawing - Revision 01: revisions to the architectural and spinkler drawingsInterior renovations to reconfigure the office partitions, renew finishes and fixtures, unit 38.
Revision 01: change regarding two exhaust fans and an exhaust hood. HVAC - Interior renovations to reconfigure the office partitions, renew finishes and fixtures, unit 38.
Revision 01: revisions to the architectural and spinkler drawingsInterior renovations to reconfigure the office partitions, renew finishes and fixtures, unit 38.
Page numbers are hidden until the total count is available from the data service.