4841-4881 YONGE ST
REV : Proposed revision - as built conditions updated (Receiving door configuration updated, swing of door into Hallway from Fragrance updated, room at rear of storage area updated) Interior Altera…
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
REV : Proposed revision - as built conditions updated (Receiving door configuration updated, swing of door into Hallway from Fragrance updated, room at rear of storage area updated) Interior Altera…
Revision 01 - Reduction in seating and occupant load, revisions to washrooms, MEP revisions, revised Mechanical Equipment location, Structural revisions for support of HVAC equipment. Revision to P…
Revision 01 - Reduction in seating and occupant load, revisions to washrooms, MEP revisions, revised Mechanical Equipment location, Structural revisions for support of HVAC equipment. Revision to P…
Revision 01 - Reduction in seating and occupant load, revisions to washrooms, MEP revisions, revised Mechanical Equipment location, Structural revisions for support of HVAC equipment. Revision to P…
Proposal to install 4 maglocks for existing office building. 3 on level 2 and 1 on level 3.
To erect and display one illuminated wall sign.****OMNI PALACE****
To erect and display one non-illuminated ground sign.****PIVOT****
Rev 01: see dwgs for more infoPlumbing - Interior alterations to unit # 301
In conjunction with a multi-storey building on the premises, proposal to erect and display an illuminated overhanging structure sign, displaying static copy at the 1st floor on the south elevation.…
Rev 01 - revising the exterior cladding of the exit stairRenovation to an existing exterior exit stair at Level 1, 2 and 3 - Yonge Sheppard Centre
Plumbing - Interior alterations to unit # 301
Interior alterations to unit # 301
HVAC - Interior alterations to unit # 301
It is proposed to protect the gas lines which supply the emergency generator on the tower roof of the yonge sheppard residential tower with a fire weap product designated 3m fire barrier duct weap …
Renovation to an existing exterior exit stair at Level 1, 2 and 3 - Yonge Sheppard Centre
HVAC - Renovation to an existing exterior exit stair at Level 1, 2 and 3 - Yonge Sheppard Centre
Plumbing - Renovation to an existing exterior exit stair at Level 1, 2 and 3 - Yonge Sheppard Centre
In conjunction with a multiple storey building on the premises, proposal to erect and display an illuminated overhanging structure sign, displaying static copy at the 1st floor on the south elevati…
Rev 01: Sprinkler drawings for suite 402Interior alterations fit up for community space, open flexible play space universal and family style washroom, reception area, office, staff room, meeting ro…
HVAC - Interior alterations for new restaurant (1436.55 m2) Cactus Club Cafe, include exterior canopy structure over existing terrace, plumbing, mechanical systems, install new equipment on adjacen…
Page numbers are hidden until the total count is available from the data service.