Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Sprinkler modification
The scope of work involved remediation following a flood incident in the existing kitchen and washrooms of the ESDC office. Water damage affected partitions and interior finishes throughout the spa…
Proposal for electromagnetic device to be added to one of the doors on the 6th floor.Door #D06S53a located on the 6th Floor Health Canada Space, to Record Room #06S53
REV Plumbing - This is a revision to the previous permit# 21 233657 PLB 00 PS. Due to budget restraints, existing ceiling and most of partitions to remain,layout has been changed, area of scope has…
REV HVAC - This is a revision to the previous permit# 21 233657 HVA 00 MS. Due to budget restraints, existing ceiling and most of partitions to remain,layout has been changed, area of scope has bee…
REV - This is a revision to the previous permit# 21 233657 BLD 00 BA. Due to budget restraints, existing ceiling and most of partitions to remain,layout has been changed, area of scope has been ext…
Proposal to perform interior alterations to construct a secure room.
Proposed new Mag-locks for Freight Vestibule Door at Level P1 (Door DNP1B) and Level P2 (Door DNP2B).
Proposed modification to the smoke control system of the building and consequently fire alarm system to address deficiencies.
REVISION 01: All scope of work deleted for the Level 1 to 13 no changes to the existing doors.Only replacing the base building Freight Vestibule/ lobby fire rated door replacement work for Level P1…
REVISION 01: All scope of work deleted for the Level 1 to 13 no changes to the existing doors. Only replacing the base building Freight Vestibule/ lobby fire rated door replacement work for Level P…
Proposed replacement of the waterproofing and complete localized concrete repairs at two loading docks.
Revision to originally approved HVAC in relation to building permit revision 23-131238 BLD 01.
Revision to originally approved plans for office.
Revision to originally approved plumbing in relation to building permit revision 23-131238 BLD 01.
Second Floor Freight Lobby Door DN02 (Existing Maglock to be removed to accommodate door replacement work. new Maglock to be installed on new door).
Interior alterations - Replacing base building Freight Vestibule/Lobby Fire Rated Door Replacement (Total: 17 Double Door)
FS - Sprinkler Shop Drawing - Interior alterations to the 3rd and 13th floor
Interior alterations to the 3rd and 13th floor
Page numbers are hidden until the total count is available from the data service.