50 GOULD ST
Temporary structure / mobile stage for TMU Student Orientation as per site plan
- Permit number
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Temporary structure / mobile stage for TMU Student Orientation as per site plan
1 WALL SIGN**TORONTO METROPOLITAN UNIVERSITY BUILDING ONTARIO**
Proposal to erect temporary mobile stage for TMU Orientation inside the TMU Community Park as per site plan. Aug.24-Aug.29 2025
Revision to replacement of existing steam condensate tank.Installation of new relief vent for existing condensate receiver tank.
Proposal to install a 40 ft by 75 ft pre-engineered temporary tent on grassy grounds at Toronto Metropolitan University community park - Install February 04th and removal February 6th 2025
This project involves the installation of a 30 ft by 75 ft pre-engineered temporary tent on grassy grounds at Toronto Metropolitan University community park - Install October 27th and removal Novem…
Proposal to erect temporary mobile stage for TMU Orientation inside the TMU Community Park as per site plan. Aug.25-Aug.30 2024
REVISION 01: Barrier-Free stair lift: change in fill railing panels from tempered glass to solid metal panelsInstallation of new barrier free ramp and lift in existing stair - Ryerson
replace make up air unit and exhaust fans
Plumbing - The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting,updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-…
The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting, updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-load-beari…
HVAC - The Front office at the Ryerson Athletic Center will be renovated. The renovation will include for new lighting,updated ductwork/HVAC and new plumbing for a small kitchen sink. Some non-load…
Revision 01: Proposal to remove the tactile pad in the drawing A8
Installation of new relief vent for existing condensate receiver tank.
Installation of new barrier free ramp and lift in existing stair - Ryerson
REVISION 2 - alterations to the sprinkler system at Ryerson Kerr Hall South in the chiller roomProposed exteriror structural roof platform, removal of boiler and associated piping and installation …
Proposal to replace the existing diesel generator with a new 200 KW natural gas generator at the existing university "Ryerson University".
HVAC - Proposal to replace the existing diesel generator with a new 200 KW natural gas generator at the existing university "Ryerson University".
1. RESTORATION OF THE EXISTING EXTERIOR ENTRANCE STAIRS 2. WATERPROOFING OF THE EXISTING ENTRANCE STRUCTURE 3. INTERIOR ENTRANCE STAIRS RESTORATION 4. ENTRANCE STRUCTURE SKYLIGHT RESTORATION4. LAND…
Proposal to reconstruct the west exit stairs in an existing university - Kerr Hall, Ryerson UniversityConvenience address is 379 Victoria St.