5050 SHEPPARD AVE E
Removal of two(2) existing 45,000L volume diesel fuel aboveground storage tanks and installation of two(2) new 50,000L volume diesel fuel aboveground storage tanks in a new area.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Removal of two(2) existing 45,000L volume diesel fuel aboveground storage tanks and installation of two(2) new 50,000L volume diesel fuel aboveground storage tanks in a new area.
Plumbing - Removal of two(2) existing 45,000L volume diesel fuel aboveground storage tanks and installation of two(2) new 50,000L volume diesel fuel aboveground storage tanks in a new area.
HVAC - Proposed installation of 60 new charge points, 20 new 150 kW chargers and a Battery Energy Storage System (BESS)
Proposed installation of 60 new charge points, 20 new 150 kW chargers and a Battery Energy Storage System (BESS)
Proposal to change the use of an existing room designated as "paint shop" to "repair shop" requiring electrical designation to non-hazardous and non-classified in which explosive atmosphere would n…
Installation of a new HVAC unit in the existing UPS room and installation of minor mechnical rooftop equipment - Malvern Garage
HVAC - Proposal for structural work for a new hvac unit in existing UPS room - Malvern Garage
Drain - Gantry bus washrack modifications and clean-up work, consists of the supply of lalbour, equipment and materials to modify the drainage and related components of two existing gantry bus wash…
Plumbing - Gantry bus washrack modifications and clean-up work, consists of the supply of lalbour, equipment and materials to modify the drainage and related components of two existing gantry bus w…
Gantry bus washrack modifications and clean-up work, consists of the supply of labour, equipment and materials to modify the drainage and related components of two existing gantry bus wash systems …
HVAC - interior alterations to add bus hoists in inspection pit, repalce 3 existing hoists, pit control plumbing & mechanical
interior alterations to add bus hoists in inspection pit, repalce 3 existing hoists, pit control plumbing & mechanical
modification of emergency egress route in the bus storage bays and associated work
HVAC - modification of emergency egress route in the bus storage bays and associated work
multiple roof top metal stairs for TTC MALVERN GARAGENOTE:Permit for 3- exterior roof access staircases ONLY-E.O.Feb.4/2013).
Plumbing - new compressor room and service piping for TTC
FS - Sprinkler Shop Drawing - new compressor room and service piping for TTC
HVAC - new compressor room and service piping for TTC
HVAC - TO CONSTRUCT AN ENCLOSURE TO SEAL OFF OIL PUMP WITHIN THE BUILDING
HVAC IMPROVEMENTS FOR TTC garage
Page numbers are hidden until the total count is available from the data service.