511 BREMNER BLVD
Proposal to install 6 mag locks, 2 in tower EE GND E ent, 2 in Tower DD GND S ent, 2 in Tower CC GND ent.
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal to install 6 mag locks, 2 in tower EE GND E ent, 2 in Tower DD GND S ent, 2 in Tower CC GND ent.
Revision to layout. - HVAC - Proposal for interior alteration (tenant fit out) for corporate offices on the first and second floor of Building DD and EE. Scope of work in building DD is on the grou…
Revision to layout - Plumbing - Proposal for interior alteration (tenant fit out) for corporate offices on the first and second floor of Building DD and EE. Scope of work in building DD is on the g…
REV01: Changes include incorporating new staircase, new bathrooms on second floor and closing of open to below on second floor Proposal for interior alteration (tenant fit out) for corporate office…
Proposal for interior alteration (tenant fit out) for corporate offices on the first and second floor of Building DD and EE. Scope of work in building DD is on the ground floor. Scope of work in bu…
Plumbing - Proposal for interior alteration (tenant fit out) for corporate offices on the first and second floor of Building DD and EE. Scope of work in building DD is on the ground floor. Scope of…
HVAC - Proposal for interior alteration (tenant fit out) for corporate offices on the first and second floor of Building DD and EE. Scope of work in building DD is on the ground floor. Scope of wor…
Proposal to install 2 mag locks to existing mixed-use (commercial & residential) building.
FS - Sprinkler Shop Drawing - Block 37: Proposal to construct 3 condo towers, 30 sty, 18 sty, and 8 sty, with a total of 625 residential units, 4 levels of below grade parking, and retail & office …
install a new hub drain for Quik Shop Convenience
Conditional Permit - Block 37: Proposal to construct 3 condo towers, 30 sty, 18 sty, and 8 sty, with a total of 625 residential units, 4 levels of below grade parking, and retail & office on portio…
REV. #1 - revise floor layout to add raised floor, reconfigure plumbingInterior alteration to an existing unit in Block 33, 1-UNIT FINISH TO HTL DENTAL, 2-HVAC PLAN, 3-PLUMBING- ADD 22 FIXTURES. Co…
REV. #1- reconfigure 24 fixturesPlumbing - Interior alteration to an existing unit in Block 33, 1-UNIT FINISH TO HTL DENTAL, 2-HVAC PLAN, 3-PLUMBING- ADD 22 FIXTURES
To erect and display two wall signs, one of which is illuminated.**HTL DENTAL**
Plumbing - Interior alteration to an existing unit in Block 33, 1-UNIT FINISH TO HTL DENTAL, 2-HVAC PLAN, 3-PLUMBING- ADD 22 FIXTURES
Interior alteration to an existing unit in Block 33, 1-UNIT FINISH TO HTL DENTAL, 2-HVAC PLAN, 3-PLUMBING- ADD 22 FIXTURES. Convenience Address 129 Fort York Blvd.
HVAC - Interior alteration to an existing unit in Block 33, 1-UNIT FINISH TO HTL DENTAL, 2-HVAC PLAN, 3-PLUMBING- ADD 22 FIXTURES
Block 37: Proposal to construct 3 condo towers, 30 sty, 18 sty, and 8 sty, with a total of 625 residential units, 4 levels of below grade parking, and retail & office on portions of the ground and …
Block 37: Proposal to construct 3 condo towers, 30 sty, 18 sty, and 8 sty, with a total of 625 residential units, 4 levels of below grade parking, and retail & office on portions of the ground and …
Block 37: Proposal to construct 3 condo towers, 30 sty, 18 sty, and 8 sty, with a total of 625 residential units, 4 levels of below grade parking, and retail & office on portions of the ground and …
Updated Nov 15, 2026