550 BAYVIEW AVE
Rev 03: changes to solar photovoltaic layout and detailsREV 02: Sprinkler fire protection modificationsRevision and addition of new exit door and replacement of exit door with roll-up door.
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Rev 03: changes to solar photovoltaic layout and detailsREV 02: Sprinkler fire protection modificationsRevision and addition of new exit door and replacement of exit door with roll-up door.
FS - Sprinkler Shop Drawing - Proposal for interior alterations and exterior patio - Building #14
HVAC - Proposal for interior alterations and exterior patio - Building #14
Proposal for interior alterations and exterior patio - Building #14
Plumbing - Proposal for interior alterations and exterior patio - Building #14
Plumbing Revision 01 - Revision to spec for replacement rooftop HVAC units for Building 1 at Evergreen Brickworks; revised replacement rooftop units weigh less than previous replacement rooftop uni…
HVAC Revision 01 - Revision to spec for replacement rooftop HVAC units for Building 1 at Evergreen Brickworks; revised replacement rooftop units weigh less than previous replacement rooftop units, …
A proposal to erect and display 6 Wall Signs, all displaying static copy.***RBC***
Plumbing - Proposal for Addition of a new vestibule (19.3 m2) and interior renovation (292.0 m2) including a reconstructed washroom block and the installation of a large translucent skylight.
HVAC - Proposal for Addition of a new vestibule (19.3 m2) and interior renovation (292.0 m2) including a reconstructed washroom block and the installation of a large translucent skylight.
Proposal for Addition of a new vestibule (19.3 m2) and interior renovation (292.0 m2) including a reconstructed washroom block and the installation of a large translucent skylight.
Proposed structural reinforcement of existing columns, update and reinforcement of existing ramps/walkways, handrails around displays, updated lighting
HVAC - Proposed repairs to exterior envelope and interior renovation - plumbing, lighting and mechanical upgrades throughout
Plumbing - Proposed repairs to exterior envelope and interior renovation - plumbing, lighting and mechanical upgrades throughout
Proposed repairs to exterior envelope and interior renovation - plumbing, lighting and mechanical upgrades throughout
Proposal to demolish existing Trellis Structure and construction of new trellis with permanent bench seating. Relocation of drinking fountain
HVAC - Proposal to demolish existing Trellis Structure and construction of new trellis with permanent bench seating. Relocation of drinking fountain
Plumbing - Proposal to demolish existing Trellis Structure and construction of new trellis with permanent bench seating. Relocation of drinking fountain
Geothermal field comprising of 40 boreholes with field repair of 5 new geothermal boreholes
Proposal for 1 certified temporary tent, 15m x 35m Hoecker Rigid Frame Structure (Cer 14 251055), anchored with concrete blocks. Install May 28th to May 31st, 2019
Updated Nov 15, 2026