56 WELLESLEY ST W
Proposal for phase 3 project construction of universal washrooms on floors 2, 4, 5, 6 and 7.
Showing first 20 matching permits
Full count unavailable.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for phase 3 project construction of universal washrooms on floors 2, 4, 5, 6 and 7.
Plumbing - Proposal for phase 3 project construction of universal washrooms on floors 2, 4, 5, 6 and 7.
HVAC - Proposal for phase 3 project construction of universal washrooms on floors 2, 4, 5, 6 and 7.
Proposal for interior alterations to construct new universal washrooms on various floors (Floors 8,9,10,12, & 14).
HVAC - Proposal for interior alterations to construct new universal washrooms on various floors (Floors 8,9,10,12, & 14).
Plumbing - Proposal for interior alterations to construct new universal washrooms on various floors (Floors 8,9,10,12, & 14).
HVAC - PROPOSED CONSTRUCTION OF UNIVERSAL WASHROOMS PHASE 2 (FLOORS 8, 9,10,12,14)
PROPOSED CONSTRUCTION OF UNIVERSAL WASHROOMS PHASE 2 (FLOORS 8, 9,10,12,14)
Plumbing - PROPOSED CONSTRUCTION OF UNIVERSAL WASHROOMS PHASE 2 (FLOORS 8, 9,10,12,14)
REVISION01:Installation of new Fire Alarm Control Panel + devices, bring existing Fire Alarm System up to current standards. 2024-11-26 : Amendment to existing permit 24 129738 FSU 00 FS - Changes …
HVAC - Proposed interior alterations to construct universal washrooms on floors 11, 15 to 18
Proposed interior alterations to construct universal washrooms on floors 11, 15 to 18, includesStructural work
Plumbing - Proposed interior alterations to construct universal washrooms on floors 11, 15 to 18
Proposal for the installation of new Fire Alarm Control Panel + devices, bring existing Fire Alarm System up to current standards
Revision 01: add 2 new doors3 new doors on the 18th floor, a single tenant floor.
proposed electromagnetic locks on the 18th floor
3 new doors on the 18th floor, a single tenant floor.
Proposed removal of podium deck overburden, strucutral concrete repairs, waterproof podium deck, reconstruct podium deck finishes
Revision #01 - Changes to HVAC.HVAC - Interior alterations to unit 103 for new restaurant
Proposed open patio for restaurant "Evviva" on ground floor of building
Page numbers are hidden until the total count is available from the data service.