580 COMMISSIONERS ST
Proposal for removal of one(1) existing 45,600L diesel fuel aboveground storage tank, one(1) existing 15,000L gasoline fuel aboveground storage tank, and associated appurtenances.
Showing first 20 matching permits
More may match beyond this page.
Sorted by most recent application date.
Alerts are not active until you save a monitor and add an email recipient.
Proposal for removal of one(1) existing 45,600L diesel fuel aboveground storage tank, one(1) existing 15,000L gasoline fuel aboveground storage tank, and associated appurtenances.
REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit…
REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit…
Rev 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit…
Roofing replacement form the level of the existing steel deck to the standing seam metal roofing, including new vapour barrier,new gutters, new penetration flashing details, new metal walkway with …
HVAC - Roofing replacement form the level of the existing steel deck to the standing seam metal roofing, including new vapour barrier,new gutters, new penetration flashing details, new metal walkwa…
HVAC - To install a wheel allignment machine and a wheeltrans bus lift (TTC)
Convert paint spray room to repair area to install a wheel allignment machine and a wheeltrans bus lift (TTC)
Plumbing - To install a wheel allignment machine and a wheeltrans bus lift (TTC)
Proposal for electrical work to add 8 charge points and chargers in an existing Bus Garage.
Electrical Work to add 8 Charge Points and Chargers
Plumbing - Proposed conversion of an existing 45,000 L volume diesel fuel tank to a 45,000 L gasoline tank and construction of an outdoor fueling station
Drain - Proposed conversion of an existing 45,000 L volume diesel fuel tank to a 45,000 L gasoline tank and construction of an outdoor fueling station
HVAC - Demolition of an existing limited use and limited application lift and associated elevator shaft and equipment. Construction of a new hydraulic passenger elevator and elevator shaft, elevato…
Installation of 2 Storm Water interceptors at 580 Commissioners steet- TTC Garage
HVAC - Addition of hose reels complete with service oil, grease and compressed air. Addition of diesel fume exhaust system. Modifications to existing HVAC system to suit new equipment.
Addition of hose reels complete with service oil, grease and compressed air. Addition of diesel fume exhaust system. Modifications to existing HVAC system to suit new equipment.
Revision 01 - shoringDemolition of an existing limited use and limited application lift and associated elevator shaft and equipment. Construction of a new hydraulic passenger elevator and elevator …
Proposed conversion of an existing 45,000 L volume diesel fuel tank to a 45,000 L gasoline tank and construction of an outdoor fueling station
Drain - Demolition of an existing limited use and limited application lift and associated elevator shaft and equipment. Construction of a new hydraulic passenger elevator and elevator shaft, elevat…